Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Carriers: big bus, dc trails 8 l street nw - washington convention center this stop is located on the south side of l street nw between 7th street nw and 9th street nw. The existing pole has two red "no parking" restriction signs and is located near a pole with a pedestrian crossing sign. Date: February 26, 2015 Client: Darnell Price | Permit type: Bus stop service; sh | |||||
SCORE 86 Carriers: big bus, dc trails 8 l street nw - washington convention center this stop is located on the south side of l street nw between 7th street nw and 9th street nw. The existing pole has two red "no parking" restriction signs and is located near a pole with a pedestrian crossing sign. Date: February 26, 2015 Contractor: Tony Hunt Client: Darnell Price | Permit type: Bus stop service; shuttle (on existing pole) | Permit status: Denied | Expiration date: February 26, 2016 | |||||
SCORE 86 Bus stop service; shuttle (on existing pole) Contractor: Tony Hunt Permit status: 2 | Expiration date: February 26, 2016 | Permit id: 0 | |||||
SCORE 86 Carriers: big bus, dc trails 8 l street nw - washington convention center this stop is located on the south side of l street nw between 7th street nw and 9th street nw. The existing pole has two red "no parking" restriction signs and is located near a pole with a pedestrian crossing sign. Contractor: Tony Hunt Permit status: Denied | Expiration date: February 26, 2016 | Permit id: 0 | |||||
SCORE 86 Bus stop service; shuttle (on existing pole) Contractor: Tony Hunt Permit status: 2 | Expiration date: February 26, 2016 | Permit id: 0 | |||||
SCORE 86 Carriers: big bus, dc trails 8 l street nw - washington convention center this stop is located on the south side of l street nw between 7th street nw and 9th street nw. The existing pole has two red "no parking" restriction signs and is located near a pole with a pedestrian crossing sign. Contractor: Tony Hunt Permit status: Denied | Expiration date: February 26, 2016 | Permit id: 0 | |||||
1) abandon water service per dc water standards including disconnection at the water main, removal of water meter box. Locations to be field verified. 2) abandon sanitary sewer laterals and associated structures per dc water standards, including disconnection at the main and plugging lateral pipe ends and connection point to main. Locations to be field verified. 3) disconnect/abandon existing gas utilities in accordance with washington gas standards. 4) disconnect existing overhead electric and communications service to lots: 39, 40, 65, 66, 838, 839, and 881. Date: April 20, 2015 Value: $5,100 Client: Hensel Phelps | Permit type: Excavation; manhole | |||||
SCORE 98 1) abandon water service per dc water standards including disconnection at the water main, removal of water meter box. Locations to be field verified. 2) abandon sanitary sewer laterals and associated structures per dc water standards, including disconnection at the main and plugging lateral pipe ends and connection point to main. Locations to be field verified. 3) disconnect/abandon existing gas utilities in accordance with washington gas standards. 4) disconnect existing overhead electric and communications service to lots: 39, 40, 65, 66, 838, 839, and 881. Date: April 20, 2015 Contractor: Hensel Phelps Permit type: Excavation; manhole removal/abandonment, excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Cancel/withdrawn | Expiration date: August 9, 2015 | |||||
SCORE 98 1) abandon water service per dc water standards including disconnection at the water main, removal of water meter box. Locations to be field verified. 2) abandon sanitary sewer laterals and associated structures per dc water standards, including disconnection at the main and plugging lateral pipe ends and connection point to main. Locations to be field verified. 3) disconnect abandon existing gas utilities in accordance with washington gas standards. 4) disconnect existing overhead electric and communications service to lots: 39, 40, 65, 66, 838, 839, and 881. Date: April 20, 2015 Contractor: Hensel Phelps Permit type: Excavation; manhole removal/abandonment, excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Cancel/withdrawn | Expiration date: August 9, 2015 | |||||
SCORE 98 Excavation; manhole removal abandonment, excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) Contractor: Hensel Phelps Permit status: 3 | Expiration date: August 9, 2015 | Permit id: 0 | |||||
SCORE 64 Other special events Date: September 14, 2012 Contractor: Brett Rindt Permit status: Expired | Expiration date: September 30, 2012 | Permit id: Pa10073019 | |||||
SCORE 88 Other special events Contractor: Rick Seymour Permit status: Rejected | Expiration date: March 4, 2015 | Permit id: 0 | |||||
SCORE 76 Other reserved parking Contractor: Stephanie Dhue Permit status: Rejected | Expiration date: October 28, 2013 | Permit id: 0 | |||||
SCORE 71 Other special events Contractor: Michael Costa Permit status: Rejected | Expiration date: June 12, 2013 | Permit id: 0 | |||||
SCORE 64 Other reserved parking Contractor: Brett Rindt Permit status: Rejected | Expiration date: September 30, 2012 | Permit id: 0 | |||||
SCORE 93 Other reserved parking Contractor: Jill Collins Permit status: Withdrawn | Expiration date: November 2, 2012 | Permit id: 0 | |||||
SCORE 98 1) abandon water service per dc water standards including disconnection at the water main, removal of water meter box. Locations to be field verified. 2) abandon sanitary sewer laterals and associated structures per dc water standards, including disconnection at the main and plugging lateral pipe ends and connection point to main. Locations to be field verified. 3) disconnect abandon existing gas utilities in accordance with washington gas standards. 4) disconnect existing overhead electric and communications service to lots: 39, 40, 65, 66, 838, 839, and 881. Contractor: Hensel Phelps Permit status: Cancel/withdrawn | Expiration date: August 9, 2015 | Permit id: 0 | |||||
SCORE 71 Other special events Contractor: Michael Costa Permit status: Rejected | Expiration date: June 12, 2013 | Permit id: 0 | |||||
SCORE 76 Other reserved parking Contractor: Stephanie Dhue Permit status: Rejected | Expiration date: October 28, 2013 | Permit id: 0 | |||||
SCORE 88 Other special events Contractor: Rick Seymour Permit status: Rejected | Expiration date: March 4, 2015 | Permit id: 0 | |||||
SCORE 98 Excavation; manhole removal abandonment, excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) Contractor: Hensel Phelps Permit status: 3 | Expiration date: August 9, 2015 | Permit id: 0 | |||||
SCORE 71 Other special events Contractor: Michael Costa Permit status: Rejected | Expiration date: June 12, 2013 | Permit id: 0 | |||||
SCORE 93 Other reserved parking Contractor: Jill Collins Permit status: Withdrawn | Expiration date: November 2, 2012 | Permit id: 0 | |||||
SCORE 64 Other reserved parking Contractor: Brett Rindt Permit status: Rejected | Expiration date: September 30, 2012 | Permit id: 0 | |||||
SCORE 76 Other reserved parking Contractor: Stephanie Dhue Permit status: Rejected | Expiration date: October 28, 2013 | Permit id: 0 | |||||
SCORE 88 Other special events Contractor: Rick Seymour Permit status: Rejected | Expiration date: March 4, 2015 | Permit id: 0 | |||||
SCORE 98 1) abandon water service per dc water standards including disconnection at the water main, removal of water meter box. Locations to be field verified. 2) abandon sanitary sewer laterals and associated structures per dc water standards, including disconnection at the main and plugging lateral pipe ends and connection point to main. Locations to be field verified. 3) disconnect abandon existing gas utilities in accordance with washington gas standards. 4) disconnect existing overhead electric and communications service to lots: 39, 40, 65, 66, 838, 839, and 881. Contractor: Hensel Phelps Permit status: Cancel/withdrawn | Expiration date: August 9, 2015 | Permit id: 0 | |||||
SCORE 71 Other special events Contractor: Michael Costa Permit status: Rejected | Expiration date: June 12, 2013 | Permit id: 0 | |||||
SCORE 76 Other reserved parking Contractor: Stephanie Dhue Permit status: Rejected | Expiration date: October 28, 2013 | Permit id: 0 | |||||
SCORE 88 Other special events Contractor: Rick Seymour Permit status: Rejected | Expiration date: March 4, 2015 | Permit id: 0 |