ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 82 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: May 2, 2014 Contractor: Jesus CasillasPermit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: May 8, 2014 | Permit id: Pds2014-Resalt- | |||||
Existing residential main electrical service upgrade - 2 amps - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: May 2, 2014Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 99 Existing residential main electrical service upgrade - 2 amps - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: May 2, 2014 Contractor: Amp Electric And Lighting Services IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 2, 2017 Contractor: N B Baker Electric IncPermit type: Addn | Permit status: Completed | Completion date: March 13, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 86 Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: June 1, 2017 Contractor: Huntamer IncPermit type: Addn | Permit status: Completed | Completion date: June 27, 2017 | Permit id: Pds2017-Resalt- | |||||
Rough electric Date: May 6, 2014Permit status: Pass | Permit id: Pds2014-Resalt- |