Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Hvac Date: May 15, 2012 Contractor: Haley Nrg Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 12044-90000-049 | |||||
SCORE 61 3. 5kw pv1 standard plan with 14 solarworld sw255 mono/ 2. 5 frame modu Date: June 4, 2014 Contractor: Angle Torres Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-148 | |||||
SCORE 61 3. 5kw pv1 standard plan with 14 solarworld sw255 mono 2. 5 frame modu Date: June 4, 2014 Contractor: Angle Torres Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-148 |