Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Installing a sub panel Date: April 15, 2015 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: May 1, 2015 | Expiration date: April 14, 2016 | Current use: Single family / duplex | Permit id: 6469234 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 5. 04kw photovoltaic system on the roof. Date: April 8, 2015 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2015 | Expiration date: April 7, 2016 | Current use: Single family / duplex | Permit id: 6467974 | |||||
SCORE 100 Circuits for heatpump and air handler Date: October 27, 2008 Contractor: As You Wish Electric Permit type: Electrical | Permit status: Permit closed | Completion date: October 31, 2008 | Expiration date: October 27, 2009 | Current use: Single family / duplex | Permit id: 6198934 |