Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a photovoltaic system on a roof Date: July 15, 2015 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 14, 2016 | Current use: Single family / duplex | Permit id: 6484455 | |||||
SCORE 95 Installing 90% afue gas furnace in sfr Date: July 18, 2007 Contractor: Bruce Smith Htg And Cooling Inc Applicant: Bruce Smith Htg & Cooling Inc | Permit type: Mechanical | Permit status: Permit issued | Expiration date: January 18, 2009 | Current use: Single family / duplex | Permit id: 6146898 | |||||
SCORE 86 Partial rewire bedrooms on top floor, hallways, basement, kitchen 12 12 17 ym adding (1) 2 amp panel Date: November 30, 2017 Contractor: Seatown Electric Corp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 30, 2018 | Current use: Single family / duplex | Permit id: 6632901 | |||||
SCORE 86 30amp range circuit 15amp furnace circuit Date: December 15, 2017 Contractor: Seatown Electric Corp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 15, 2018 | Current use: Single family / duplex | Permit id: 6635625 |