ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Plumbing permit Date: February 23, 2016Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 671196 | |||||
Mechanical permit Date: November 12, 2015Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 651684 | |||||
New construction permit Date: October 13, 2015Client: Callahan Ward Oxford Llc | Permit status: Active | Permit id: 630573 | |||||
Suppression permit Date: January 19, 2016Client: Callahan Ward Oxford Llc | Permit status: Active | Permit id: 657430 | |||||
Electrical permit Date: December 4, 2015Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 655949 | |||||
Zoning/use permit Date: June 10, 2014Client: De-Cat Inc | Permit status: Completed | Permit id: 541225 | |||||
New construction permit Date: October 13, 2015Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 630573 | |||||
Administrative permit Date: January 18, 2017Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 651244 | |||||
Plumbing permit Date: February 23, 2016Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 671196 | |||||
Electrical permit Date: December 4, 2015Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 655949 | |||||
Mechanical permit Date: November 12, 2015Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 651684 | |||||
Suppression permit Date: January 19, 2016Client: Callahan Ward Oxford Llc | Permit status: Completed | Permit id: 657430 | |||||
SCORE 89 Interior plumbing construction for a new (4)story single-family dwelling - vent termination(s) at the roof deck level will comply with section p-1103. 4. 1 of the philadelphia plumbing code 2004 - note: exterior & sewer water connection(s) to the city mains were done "by others" (see plumbing permit ap#671196) Date: February 22, 2016 Contractor: Priority PlumbingClient: Shipon Matthew A | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 670215 | |||||
SCORE 100 Install 5" lateral,curb trap and pipe to basement and 1" water service pa20160461875(sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: February 23, 2016 Contractor: Norman Cole Sr,Client: Shipon Matthew A | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 24, 2016 | Permit id: 671196 | |||||
SCORE 99 Installation of (2) hvac units (including ductwork and associated accessories). Sfd Date: December 23, 2015 Contractor: Kenrich Mechanical IncClient: Shipon Matthew A | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 660065 | |||||
SCORE 100 For the installation of an automatic fire suppression system throughout a single-family dwelling in accordance with nfpa 13r standards. System to be provided via a 2" fire service main line and equipped with a backflow prevention assembly. Date: January 19, 2016 Contractor: Metropolitan Fire ProtectionClient: Shipon Matthew A | Permit type: Suppression permit | Permit status: Completed | Completion date: January 19, 2017 | Permit id: 657430 | |||||
New construction of (4) story wood framed sstructure with full cellar, 4th story roof deck with access from the 4th story for use as a single family dwelling. Date: October 13, 2015Client: Shipon Matthew A | Permit type: New construction permit | Permit status: Completed | Completion date: January 20, 2017 | Permit id: 630573 | |||||
Amend permit 630573. New construction 4 story wood frames sfd. Full cellar 4th story roof deck with access from 4th story Date: January 18, 2017Client: Shipon Matthew A | Permit type: Administrative permit | Permit status: Completed | Completion date: January 20, 2017 | Permit id: 651244 | |||||
SCORE 89 Complete electrical wiring includes all devices, fixtures, phone and tv, smoke detectors, carbon monoxide detectors and 2 amp service as per 2008 nec (cc district) Date: December 4, 2015 Contractor: Reel Electric IncClient: Shipon Matthew A | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2016 | Permit id: 655949 | |||||
SCORE 99 Gas fireplace as per manufacturers specs ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 12, 2015 Contractor: Callahan And Ward Properties, LlClient: Shipon Matthew A | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 12, 2016 | Permit id: 651684 | |||||
SCORE 89 Interior plumbing construction for a new (4)story single-family dwelling - vent termination(s) at the roof deck level will comply with section p-1103. 4. 1 of the philadelphia plumbing code 2004 - note: exterior & sewer water connection(s) to the city mains were done "by others" (see plumbing permit ap#671196) Date: February 22, 2016 Contractor: Priority PlumbingClient: Shipon Matthew A | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 670215 | |||||
Zoning use permit Date: June 10, 2014Client: De-Cat Inc | Permit status: Completed | Permit id: 541225 | |||||
For the erection of an attached structure with cellar (maximum height nte 38 ft) with roof terrace (roof deck). For use as a single family dwelling and one accessory off street interior parking space. Size and location as shown in the application. Date: June 10, 2014Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 541225 |