ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: October 14, 2015Permit status: Completed | Permit id: 644939 | |||||
Addition permit Date: September 2, 2016Permit status: Active | Permit id: 680744 | |||||
Mechanical permit Date: August 3, 2015Permit status: Completed | Permit id: 622486 | |||||
Alteration permit Date: June 29, 2015Permit status: Completed | Permit id: 616615 | |||||
Use permit Date: March 17, 2016Permit status: Completed | Permit id: 677383 | |||||
Zoning/use permit Date: October 19, 2015Permit status: Completed | Permit id: 639279 | |||||
Suppression permit Date: August 11, 2015Permit status: Completed | Permit id: 631264 | |||||
Use permit Date: January 20, 2015Permit status: Completed | Permit id: 585498 | |||||
Plumbing permit Date: October 19, 2015Permit status: Completed | Permit id: 638306 | |||||
Mechanical permit Date: August 3, 2015Permit status: Completed | Permit id: 622486 | |||||
Suppression permit Date: August 11, 2015Permit status: Completed | Permit id: 631264 | |||||
Alteration permit Date: June 29, 2015Permit status: Completed | Permit id: 616615 | |||||
Use permit Date: March 17, 2016Permit status: Completed | Permit id: 677383 | |||||
Plumbing permit Date: October 19, 2015Permit status: Completed | Permit id: 638306 | |||||
Electrical permit Date: October 14, 2015Permit status: Completed | Permit id: 644939 | |||||
Zoning use permit Date: October 19, 2015Permit status: Completed | Permit id: 639279 | |||||
Use permit Date: January 20, 2015Permit status: Completed | Permit id: 585498 | |||||
Addition permit Date: September 2, 2016Permit status: Active | Permit id: 680744 | |||||
SCORE 99 For the relocation of existing fan and mechanical appliance and to extent existing ductwork from 2nd floor to 4th floor above addition as per plans. Date: September 28, 2017 Contractor: Kien Phung Gen Contractor IncPermit type: Mechanical permit | Permit status: Active | Completion date: September 28, 2017 | Permit id: 812340 | |||||
SCORE 100 For the installation of registers, diffuser and mechanical equipment with associated ductwork on the first floor level of an existing building for use as a sit down restaurant. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for all other work. Date: December 3, 2015 Contractor: Cape Air LlcPermit type: Mechanical permit | Permit status: Completed | Completion date: December 31, 2015 | Permit id: 628170 | |||||
SCORE 99 Ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 11, 2015 Contractor: Reliable Fire Protection IncPermit type: Suppression permit | Permit status: Completed | Completion date: December 31, 2015 | Permit id: 631264 | |||||
SCORE 100 Interior plumbing construction for a sit-down restaurant (bubble fish) on the 1st floor - the installation will comply with tables p-811. 2 & p-904. 7 of the philadelphia plumbing code and water supply to fixtures equipment will be protected by a method listed in table 608. 1 of the international plumbing code - note: the backflow prevention containment device at the water meter will be installed "by others" (separate permit required) Date: October 19, 2015 Contractor: Flow Temp 368 Gen Cont IncPermit type: Plumbing permit | Permit status: Completed | Completion date: December 31, 2015 | Permit id: 638306 | |||||
SCORE 86 Replace smoke alarm, pull stations & horn strobes & relocate from one side of the room to the other, (devices of the same kind) as per nfpa 72 cc district Date: October 14, 2015 Contractor: B.E.CPermit type: Electrical permit | Permit status: Completed | Completion date: January 11, 2016 | Permit id: 644939 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Relocate (9) automatic sprinkler to match new renovation. Post this permit Date: October 14, 2015 Contractor: Cellich Fire Protection IncPermit type: Suppression permit | Permit status: Completed | Completion date: December 31, 2015 | Permit id: 645002 | |||||
For use as personal services on third and fourth floor with existing sit down restaurant on first floor and existing personal services on second floor as previously approved, no sign on this permit, Date: March 17, 2016Permit type: Use permit | Permit status: Completed | Completion date: March 17, 2016 | Permit id: 677383 | |||||
SCORE 99 For partial demolition and re-construction of the second floor and for a two-story addition to an existing two-story structure, as per approved plans. No work on the first floor. Removal of asbestos required prior to start of work Date: September 2, 2016 Contractor: Kien Phung Gen Contractor IncPermit type: Addition permit | Permit status: Active | Completion date: July 5, 2017 | Permit id: 680744 | |||||
SCORE 100 Level ii alterations with partial change of occupancy to create a sit down restaurant on the first floor of an existing building as per approved plans. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: June 29, 2015 Contractor: Lins Decoration Contractor IncPermit type: Alteration permit | Permit status: Completed | Completion date: December 31, 2015 | Permit id: 616615 | |||||
SCORE 99 Install type 1 12ft hood with duct work and fans Date: August 3, 2015 Contractor: Reliable Fire Protection IncPermit type: Mechanical permit | Permit status: Completed | Completion date: December 31, 2015 | Permit id: 622486 | |||||
SCORE 86 2 amp service disconnect, rewire including lights, receptacles and switches per 2008 nec (restaurant) panel kp and disconnect only. Date: August 21, 2015 Contractor: B.E.CPermit type: Electrical permit | Permit status: Completed | Completion date: January 11, 2016 | Permit id: 626911 | |||||
SCORE 100 Install nfpa 13 sprinkler system for commercial space. 4" feed main. Code design prof: john e. Fee, pe Date: April 30, 2015 Contractor: Oneida Fire ProtectionPermit type: Suppression permit | Permit status: Completed | Completion date: December 4, 2015 | Permit id: 600070 |