ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alteration permit Date: October 6, 2009Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 241076 | |||||
Electrical permit Date: April 30, 2010Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Expired | Permit id: 276283 | |||||
Plumbing permit Date: September 9, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Active | Permit id: 711859 | |||||
Use permit Date: February 8, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 668389 | |||||
Alteration permit Date: June 15, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Active | Permit id: 689775 | |||||
Alteration permit Date: October 6, 2009Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 241076 | |||||
Alteration permit Date: June 15, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 689775 | |||||
Electrical permit Date: April 30, 2010Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Expired | Permit id: 276283 | |||||
Mechanical permit Date: December 2, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 740889 | |||||
Electrical permit Date: November 3, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 714201 | |||||
Use permit Date: February 8, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 668389 | |||||
Plumbing permit Date: September 9, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit status: Completed | Permit id: 711859 | |||||
SCORE 92 Replace four windows within existing openings at second and third floor level. Repoint front brick facade. Apply three coat stucco, approx 1 square feet. Date: October 6, 2009 Contractor: Preston General ContractingClient: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Alteration permit | Permit status: Completed | Completion date: September 7, 2010 | Permit id: 241076 | |||||
SCORE 100 2 amp service as per 2008 nec,no electric heat, no electric cooking (cc dist) Date: April 30, 2010 Contractor: Salvatore CantoneClient: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Electrical permit | Permit status: Expired | Completion date: August 13, 2010 | Permit id: 276283 | |||||
For a prepared food shop on first floor and all other uses as previously approved in an existing structure. No sign on this permit. Date: February 8, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Use permit | Permit status: Completed | Completion date: February 8, 2016 | Permit id: 668389 | |||||
SCORE 86 Install branch circuits for new layout. 3-20amp circuits, reconfigure lighting, 1-15amp circuit, 1-30amp pole. Existing 200amp service to be used as per 2008 nec (cc district) Date: November 3, 2016 Contractor: Talon Fire And Security Sys LlcClient: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2016 | Permit id: 714201 | |||||
SCORE 93 Interior plumbing alterations on the 1st floor for a tenant fit-out of an ice cream parlor (weckerlys) - note: the requirment for a grease trap at the 3-compartment utensil sink has been waived (not required) - due to small area of alteration involved, the department has waived the plan review and the permit will be issued as an ez-permit - all required documentation normally required (health department review approval letter grease trap waiver request letter) are attached to this permit as "ole" files Date: September 9, 2016 Contractor: Michael FugarinoClient: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 9, 2016 | Permit id: 711859 | |||||
For level ii alterations to an existing tenant space for use as a mercantile, alterations to include new storefront, furnishings and finishes throughout. All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for mechanical, electrical, and plumbing work. Date: June 15, 2016Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Alteration permit | Permit status: Completed | Completion date: December 9, 2016 | Permit id: 689775 | |||||
Replace existing front entry door and two windows within existing openings. No changes to size or location allowed under this permit. Date: August 5, 2009Client: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Alteration permit | Permit status: Completed | Completion date: August 2, 2013 | Permit id: 230407 | |||||
SCORE 89 Install (1) double head mini split system. (mixed use) Date: December 2, 2016 Contractor: Alkaun CoClient: Heron Holdings Llc | Client Company: Elk Street Mgmt | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 9, 2016 | Permit id: 740889 |