Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Lot 9 Date: September 17, 2008 Permit status: Closed | Permit id: 08-05139 | |||||
SCORE 99 Lot 9 Client: Lot 9 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-05139 | Parcel: 20937 | |||||
SCORE 99 Lot 9 Client: Lot 9 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-05139 | Parcel: 20937 | |||||
SCORE 100 Lot 9 Client: Lot 9 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-05139 | Parcel: 20937 | |||||
September 3, 2008 12:20:22 pm scarver. Mobile home placement on existing lot 9-ramsey;s mobile home park;scc; september 11, 2008 9:37:31 am heatherr. Premise #redacted phone number9 called in by bridget from love homes; september 17, 2008 8:50:01 am kneel. Mobile home placement on existing lot 9-ramsey;s mobile home park; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit Permit type: Permits - historical | Permit status: Closed | Permit id: 08-05139 | Parcel: 20937 | |||||
Lot 9 Date: September 17, 2008 Value: $32,500 Permit type: Historical | Permit status: Closed | Permit id: 08-05139 | |||||
September 3, 2008 12:20:22 pm scarver. Mobile home placement on existing lot 9-ramsey;s mobile home park;scc; september 11, 2008 9:37:31 am heatherr. Premise #redacted phone number9 called in by bridget from love homes; september 17, 2008 8:50:01 am kneel. Mobile home placement on existing lot 9-ramsey;s mobile home park; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit Date: September 17, 2008 Permit type: Permits - historical | Permit status: Closed | Permit id: 08-05139 | Parcel: 20937 |