| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Excavate to place 1 4x8x6 manhole #71 and place 102 of 4-4" main line conduit from new manhole to existing manhole #2287 in the roadway of the intersection of 9th street and m street se as shown on job 9a07273. Tcps attached. Date: February 15, 2012 Contractor: VerizonPermit type: Excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: June 13, 2012 | Permit id: Pa69451 | |||||
SCORE 95 Excavate to place 1 4x8x6 manhole #71 and place 102 of 4-4" main line conduit from new manhole to existing manhole #2287 in the roadway of the intersection of 9th street and m street se as shown on job 9a07273. Tcps attached. Date: June 1, 2012 Contractor: VerizonPermit type: Excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: August 14, 2012 | Permit id: Pa69451-R1 | |||||
SCORE 95 Excavate to place 1 4x8x6 manhole #71 and place 102 of 4-4" main line conduit from new manhole to existing manhole #2287 in the roadway of the intersection of 9th street and m street se as shown on job 9a07273. Tcps attached. Date: June 1, 2012 Contractor: VerizonPermit type: Excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: August 14, 2012 | Permit id: Pa69451-R1 | |||||
SCORE 92 Other work related occupancy Date: May 18, 2012 Contractor: Corman ConstructionPermit status: Expired | Expiration date: October 28, 2012 | Permit id: Pa10057136 | |||||
SCORE 89 Enp for ddot contractors Date: February 12, 2015 Contractor: Hsa, IncPermit status: Expired | Expiration date: March 20, 2015 | Permit id: Pa10176930 | |||||
SCORE 100 Construction staging area Date: July 20, 2012 Contractor: Washington GasPermit status: Expired | Expiration date: August 15, 2012 | Permit id: Pa10066362 | |||||
SCORE 100 Construction staging area Date: August 29, 2012 Contractor: Verizon ConstructionPermit status: Expired | Expiration date: September 24, 2012 | Permit id: Pa10071156 | |||||
SCORE 100 Steel plate- single location Date: June 8, 2012 Contractor: Verizon ConstructionPermit status: Expired | Expiration date: July 3, 2012 | Permit id: Pa10062020 | |||||
SCORE 70 Construction staging area Contractor: Nicholas MachakPermit status: Withdrawn | Expiration date: October 31, 2016 | Permit id: 0 | |||||
SCORE 90 Construction staging area Date: October 27, 2016 Contractor: Csx Transportation, IncPermit status: Expired | Expiration date: November 30, 2016 | Permit id: Pa10333330-R1 | |||||
SCORE 70 Construction staging area Contractor: Nicholas MachakPermit status: Withdrawn | Expiration date: October 31, 2016 | Permit id: 0 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon 1 monitoring well (sac-325). The well is located on private property and the work has been approved under dcra permit sb1700393. The monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a are now complete. Therefore, the wells installed as part of this division are no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. There will be no work on public space. There will be a hose ramp installed as to not impede pedestrian walkways. Date: August 4, 2017 Contractor: Siva BaluClient: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: September 30, 2017 | Permit id: Pa220081 | |||||
SCORE 79 Excavation; boring test pit (single) Date: August 17, 2017 Contractor: Siva BaluPermit status: 8 | Expiration date: September 30, 2017 | Permit id: Pa220081 | |||||
SCORE 70 Construction staging area Contractor: Nicholas MachakPermit status: Withdrawn | Expiration date: October 31, 2016 | Permit id: 0 | |||||
SCORE 95 Excavate to place 1 4x8x6 manhole #71 and place 102 of 4-4" main line conduit from new manhole to existing manhole #2287 in the roadway of the intersection of 9th street and m street se as shown on job 9a07273. Tcps attached. Date: February 15, 2012 Contractor: VerizonPermit type: Excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: June 13, 2012 | Permit id: Pa69451 | |||||
SCORE 82 Proposed route begins at an existing verizon manhole #2287 located at the intersection of 9th street and m street se. Trench to place 651 of (1) 4" pvc equipped with (3) 1. 25" indt equipped with (1) 144 fiber easterly along m street se to the intersection of 11th street and m street se. Mci proposes to place (2) 4x4x4 manholes. Date: July 29, 2017 Contractor: National Telecom Design National Telecom DesignClient: Mcimetro Access Transmission Services Mci | Permit type: Excavation; manhole installation, excavation; telecom connection (trench) | Permit status: Issued | Expiration date: November 24, 2017 | Permit id: Pa219810 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon 1 monitoring well (sac-325). The well is located on private property and the work has been approved under dcra permit sb1700393. The monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a are now complete. Therefore, the wells installed as part of this division are no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. There will be no work on public space. There will be a hose ramp installed as to not impede pedestrian walkways. Date: August 17, 2017 Contractor: Jamie Miller, AecomPermit status: Permit expired | Expiration date: September 30, 2017 | Permit id: Pa220081 | |||||
SCORE 87 Construction staging area Date: March 21, 2016 Contractor: Capitol Riverfront BidPermit status: Permit expired | Expiration date: April 1, 2016 | Permit id: Pa10233463 | |||||
SCORE 70 Construction staging area Contractor: Nicholas MachakPermit status: Withdrawn | Expiration date: October 31, 2016 | Permit id: 0 | |||||
SCORE 90 Construction staging area Date: September 16, 2016 Contractor: Csx Transportation, IncPermit status: Permit expired | Expiration date: November 4, 2016 | Permit id: Pa10333330 | |||||
SCORE 90 Construction staging area Date: January 3, 2017 Contractor: Csx Transportation, IncPermit status: Permit expired | Expiration date: January 12, 2017 | Permit id: Pa10333330-R3 | |||||
SCORE 82 Construction staging area Date: September 18, 2017 Contractor: National Telecom Design National Telecom DesignPermit status: Issued | Expiration date: November 23, 2017 | Permit id: Pa10464122 |