SCORE 86 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a and relocation the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 5 5 15-plan change to add electrical panel relocation (200a) kp Date: September 24, 2014 Contractor: Cody OramPermit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: June 2, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 11, 2015 Contractor: Vivint Solar Developer LlcPermit type: Residential alteration-addn | Permit status: Completed | Completion date: March 29, 2016 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a and relocation the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 5 5 15-plan change to add electrical panel relocation (200a) kp Date: September 24, 2014 Contractor: Vivint Solar Developer LlcPermit type: Residential alteration-addn | Permit status: Completed | Completion date: June 2, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: March 24, 2016Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: May 29, 2015Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Rough electric Date: November 5, 2014Permit status: Pass | Permit id: Pds2014-Resalt- |