ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv and electrical panel change out for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 30, 2013 Contractor: Brian MilhollandPermit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: November 22, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv and electrical panel change out for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 30, 2013Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 22, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Roof mount residential solar pv and electrical panel change out for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 30, 2013 Contractor: Milholland Electric IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: November 22, 2013 | Permit id: Pds2013-Resalt- | |||||
Final Date: November 21, 2013Permit status: Pass | Permit id: Pds2013-Resalt- |