Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Full-line sewer excavation from house to city main under a dirt alley. Date: July 11, 2012 Contractor: Pipeline Industries Inc Client: Family Steuben | Applicant: Pipeline Industries, Inc | Permit type: Wastewater, right-of | Permit status: Iss | Current use: Single family a | |||||
SCORE 98 Total tear-off & reroof of sfd, 21. 66 squares of asphalt shingles on a pitch represented as 10 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Date: July 30, 2013 Contractor: Metro Construction Inc Client: Shemryn Trapp,Karla Trapp | Applicant: Metro Construction, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 14, 2013 | Current use: Single family d | |||||
SCORE 97 Total tear-off & reroof of sfd, 21. 66 squares of asphalt shingles on a pitch represented as 10 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Client: Shemryn Trapp | Permit type: Roofing | Permit status: Cmp | Completion date: August 14, 2013 | Current use: Single family detached dwelling | Permit id: Pmt2013-03656 | |||||
SCORE 95 Full-line sewer excavation from house to city main under a dirt alley. Date: July 11, 2012 Contractor: Pipeline Industries, Inc Client: Family Steuben | Permit type: Wastewater, right-of-way | Permit status: Iss | Current use: Single family attached dwelling, existin | Permit id: Pmt2012-03356 |