Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Construction staging area Date: February 4, 2013 Contractor: Connelly And Associates Inc Permit status: Expired | Expiration date: February 22, 2013 | Permit id: Pa10083192-R1 | |||||
SCORE 79 Excavation; boring test pit (single) Contractor: Siva Balu Permit status: 1 | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (nebbc-47) located in the right most lane of the west bound w street nw. 58. 17 feet east of the 1st street nw & w street nw intersection. This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division pr-a is now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). Monitoring wells will be abandoned following doee regulations. See attached wo Date: May 23, 2017 Contractor: Siva Balu Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (nebbc-47) located in the right most lane of the west bound w street nw. 58. 17 feet east of the 1st street nw & w street nw intersection. This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division pr-a is now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). Monitoring wells will be abandoned following doee regulations. See attached wo Contractor: Homaira Sharif, Aecom Permit status: Approved (pending payment | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: January 7, 2013 Contractor: Connelly And Associates Inc Permit status: Permit expired | Expiration date: January 31, 2013 | Permit id: Pa10083192 | |||||
SCORE 79 Excavation; boring test pit (single) Date: June 22, 2017 Contractor: Siva Balu Permit status: 8 | Expiration date: August 5, 2017 | Permit id: Pa205755 | |||||
SCORE 86 Drill one geotechnical boring, nebbc-47, located in the westbound parking lane of w street nw approximately feet east of the 1st street nw and w street nw intersection. The boring will be 6 inches in diameter and approximately 1 feet deep. A monitoring well will be installed upon completion. The work time will be approximately 2 weeks and the work will require 24/7 occupancy of the work area. A full work time between 7am and 7pm is also required. The temporary monitoring well will remain for up to 5 years. Date: December 18, 2012 Contractor: Connelly And Associates Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: February 28, 2013 | Permit id: Pa77984 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (nebbc-47) located in the right most lane of the west bound w street nw. 58. 17 feet east of the 1st street nw & w street nw intersection. This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division pr-a is now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). Monitoring wells will be abandoned following doee regulations. See attached wo Date: June 22, 2017 Contractor: Homaira Sharif, Aecom Permit status: Permit expired | Expiration date: August 5, 2017 | Permit id: Pa205755 | |||||
SCORE 59 Construction staging area Date: October 24, 2013 Contractor: Sara Kaufman Permit status: Permit expired | Expiration date: January 30, 2014 | Permit id: Pa10118275 | |||||
SCORE 63 Moving truck Date: March 10, 2015 Contractor: Adam Higgins Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa10179441 | |||||
SCORE 84 Other reserved parking Date: August 3, 2016 Contractor: Cindi Butchko Permit status: Permit expired | Expiration date: August 5, 2016 | Permit id: Pa10328885 | |||||
SCORE 99 Construction staging area Date: June 29, 2017 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: August 11, 2017 | Permit id: Pa10428293 |