Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: March 10, 2011 Client: Paronish Mark A | Permit status: Completed | Permit id: 327776 | |||||
Alteration permit Date: February 24, 2011 Client: Paronish Mark A | Permit status: Completed | Permit id: 326476 | |||||
Electrical permit Date: March 3, 2011 Client: Paronish Mark A | Permit status: Completed | Permit id: 327945 | |||||
Electrical permit Date: March 3, 2011 Client: Paronish Mark A | Permit status: Completed | Permit id: 327945 | |||||
Alteration permit Date: February 24, 2011 Client: Paronish Mark A | Permit status: Completed | Permit id: 326476 | |||||
Plumbing permit Date: March 10, 2011 Client: Paronish Mark A | Permit status: Completed | Permit id: 327776 | |||||
SCORE 99 Interior alterations. To 1st floor unit, kitchen - remove and replace cabinets, countertop, flooring and drop ceiling. Frame out drop ceiling with 2 x 4s and sheetrock. Fur out party line wall with 1x3s and 1 2" sheetrock. Bathroom-demo to existing studs and install sheetrock and backer board as needed . Replace window with smaller size using the existing lentil and replace brickwork to match existing exterior. Applicant agrees to limit the construction to comply with ez permit standards of interior alterations dated feb., 2007. Deviation from the standarad will result in revocation of this permit and imposition of penalties. Plumbing, mechanical and electrical approvals are not included in this application Date: February 24, 2011 Contractor: Ken Sowisdral Bldg And Remodelin Client: Paronish Mark A | Permit type: Alteration permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 326476 | |||||
SCORE 100 Install new kitchen; re-rough second floor bathroom and install bathtub, toilet and vanity. Date: March 10, 2011 Contractor: Edward Mattio Client: Paronish Mark A | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 327776 | |||||
SCORE 100 Rewire kitchen:6 duplex receptacles (gfcis),1 dishwasher line, ( amp), 1 garbage disposal line ( amp),6 recessed fixtures,1 bathroom fan, 1 bathroom gfci, all as per 2008 nec (cc dist) Date: March 3, 2011 Contractor: Radon Leszek Client: Paronish Mark A | Permit type: Electrical permit | Permit status: Completed | Completion date: February 23, 2016 | Permit id: 327945 |