ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 96 Plumbing and gas Date: September 9, 2016 Contractor: Thomas E CuddebackClient: Lt Jp Kennedy Institute | Permit status: Permit issued | Permit id: P1609332 | |||||
SCORE 92 Electrical Date: September 9, 2016 Contractor: Jeffrey B. ZarinClient: Lt Jp Kennedy Institute | Permit status: Permit issued | Permit id: E1609971 | |||||
SCORE 96 Plumbing and gas Date: September 9, 2016 Contractor: Thomas E CuddebackClient: Lt Jp Kennedy Institute | Permit status: Permit issued | Permit id: P1609332 | |||||
SCORE 65 12 sq. Ft. Section of the roof replacement. Remove existing roof membrane and insulation. Screw down new iso insulation and fiberglass mat roof board. Install new mechanically attached tpo roof system. Replace parapet walls coping metal. Non structural Date: April 28, 2015 Contractor: Benjamin FroebelClient: Catholic Charities Of The Archdiocese Of Washingto | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1506979 | |||||
SCORE 96 Boiler Date: September 9, 2016 Contractor: Thomas E CuddebackClient: Lt Jp Kennedy Institute | Permit status: Permit issued | Permit id: Fb1600114 | |||||
SCORE 56 The plan proposes to remove the existing 50 gallon ust located at 801 buchanan st ne as shown on the plan. The plan excavation area is less than sf. Date: August 5, 2016Client: Lt Jp Kennedy Institute | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1600067 | |||||
SCORE 92 Electrical Date: September 9, 2016 Contractor: Jeffrey B. ZarinClient: Lt Jp Kennedy Institute | Permit status: Completed | Permit id: E1609971 | |||||
SCORE 96 Plumbing and gas Date: September 9, 2016 Contractor: Thomas E CuddebackClient: Lt Jp Kennedy Institute | Permit status: Completed | Permit id: P1609332 |