ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated 45amp breaker for solar pv system to be installed on the roof. Date: October 15, 2015 Contractor: West Seattle Natrl Energy LlcPermit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2015 | Expiration date: October 14, 2016 | Current use: Single family / duplex | Permit id: 6499981 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated 45amp breaker for solar pv system to be installed on the roof. Date: October 15, 2015 Contractor: West Seattle Electric And SolarPermit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2015 | Expiration date: October 14, 2016 | Current use: Single family / duplex | Permit id: 6499981 |