Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Relocate two existing ct- and machines and miscellandeous etd circuits Date: May 6, 2016 Contractor: Boshard Electric Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-04355 | |||||
SCORE 100 Site infrastructure and sitelighting Date: February 2, 2016 Contractor: Taylor Electric Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-00809 | |||||
SCORE 100 (fire sprinkler only) install a single interlock preaction system for the it node rooms in concourse c & d. Date: March 21, 2016 Contractor: Certified Fire Protection Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-01855 | |||||
SCORE 56 Relocate grilles and registers, relocate radiant tube heater, remove refrigerant from rtus Date: April 19, 2016 Contractor: Enviromental Control Systems Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-03658 | |||||
SCORE 100 Run new power for new terminal kiosk Date: May 4, 2016 Contractor: Rydalch Electric Permit type: Electrical | Permit id: Bld2016-04246 | |||||
Pending. Remodel of existing fed ex building Date: June 28, 2016 Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-06156 | |||||
SCORE 66 Replace roof drains and re route drain lines, gas line re work and move hose bib Date: April 19, 2016 Contractor: Northern Construction Llc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-03653 | |||||
SCORE 100 Please arrange payment for the balance due. Install new power for new kiosk Date: May 4, 2016 Contractor: Rydalch Electric Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-04247 | |||||
SCORE 100 Please arrange payment for the balance due. Add branch circuitry for floorboxes at canada air at slcia Date: May 4, 2016 Contractor: Taylor Electric Inc Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-04286 | |||||
Please arrange payment of the balance due. One interior partition wall will be removed to convert two offices into a new conference room. The "old" conference room will be converted into a new office. There is the necessity to move one short wall 2 to a new location. This is city owned property and the application is being submitted by a salt lake city department of airports employee. Date: January 7, 2016 Permit status: In for review | Permit id: Bld2016-00094 | |||||
SCORE 100 Please pay fees due repair the existing bag handling belt at the ticket counter Date: December 4, 2015 Contractor: Boshard Electric Inc Permit type: Electrical | Permit status: Need info | Permit id: Bld2015-10408 | |||||
SCORE 100 Fire sprinklers Date: January 4, 2016 Contractor: Quality Fire Protection Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2015-10496 | |||||
SCORE 100 Provide and install passur aircraft tracking system Date: January 7, 2016 Contractor: Boshard Electric Inc Permit type: Electrical | Permit id: Bld2016-00140 | |||||
SCORE 93 Renovation of the old fed-ex warehouse at the salt lake city international airport. The new operations center will consolidate the police, administration, operations, vehicle maintenance, data, and badging department into this facility. The existing masonry roof structure will remain while the entire interior will be transitioned from a warehouse to an office (separated mixed-use) occupancy. This project will be seeking leed silver certification. Date: May 20, 2016 Contractor: Architectural Nexus Permit status: Inspections | Permit id: Bld2015-06482 | |||||
SCORE 100 Please arrange payment for the balance due. Install new power for new kiosk Date: May 4, 2016 Contractor: Rydalch Electric Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-04247 | |||||
SCORE 100 (fire sprinkler only) install a single interlock preaction system for the it node rooms in concourse c & d. Date: March 21, 2016 Contractor: Certified Fire Protection, Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-01855 | |||||
SCORE 56 Please arrange payment of the balance due. One interior partition wall will be removed to convert two offices into a new conference room. The "old" conference room will be converted into a new office. There is the necessity to move one short wall 2 to a new location. This is city owned property and the application is being submitted by a salt lake city department of airports employee. Date: January 7, 2016 Contractor: Salt Lake City Municipal Employee Permit status: In for review | Permit id: Bld2016-00094 | |||||
SCORE 100 Re-use is not identified. Date: February 19, 2016 Contractor: Grant Mackay Company Inc Permit type: Demolition | Permit status: In for review | Permit id: Bld2016-01390 | |||||
SCORE 100 Please pay fees due repair the existing bag handling belt at the ticket counter Date: December 4, 2015 Contractor: Boshard Electric Inc Permit type: Electrical | Permit status: Need info | Permit id: Bld2015-10408 | |||||
SCORE 100 Fire sprinklers Date: January 4, 2016 Contractor: Quality Fire Protection Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2015-10496 | |||||
SCORE 100 Demo bldg Date: February 26, 2016 Contractor: Grant Mackay Company Inc Permit type: Demolition | Permit status: In for review | Permit id: Bld2016-01729 | |||||
SCORE 100 Provide and install passur aircraft tracking system Date: January 7, 2016 Contractor: Boshard Electric Inc Permit type: Electrical | Permit id: Bld2016-00140 | |||||
SCORE 100 Run new power for new terminal kiosk Date: May 4, 2016 Contractor: Rydalch Electric Permit type: Electrical | Permit id: Bld2016-04246 | |||||
SCORE 89 Concourse a-1 ti Date: July 14, 2016 Contractor: Ais Commercial Construction Inc Permit status: Inspections | Permit id: Bld2016-06645 | |||||
SCORE 100 Relocate two existing ct- and machines and miscellandeous etd circuits Date: May 6, 2016 Contractor: Boshard Electric Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-04355 | |||||
SCORE 66 Replace roof drains and re route drain lines, gas line re work and move hose bib Date: April 19, 2016 Contractor: Northern Construction Llc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-03653 | |||||
SCORE 89 Concourse b- interior only, elect permit reqd remodel of retail space. Date: June 30, 2016 Contractor: Ais Commercial Construction Inc Permit status: Inspections | Permit id: Bld2016-06262 | |||||
SCORE 65 Re-roof of concourse a, the c-d connector and the boiler plant building. As per slc dept of airport specification. Remove existing membrane roofing. Install new roofing insulation cover board, install new single-ply roofing membrane. Date: September 1, 2016 Contractor: Conwest, Inc Permit type: Roofing | Permit id: Bld2016-08253 | |||||
SCORE 99 Minor electrical modifications. Move two outlets for coolers, add spot lights Date: August 26, 2016 Contractor: Alltech Electric Permit type: Electrical | Permit id: Bld2016-08057 | |||||
SCORE 100 Remodel electrical for avis car rental Date: November 7, 2016 Contractor: Hedgehog Electric, Llc Permit type: Electrical | Permit id: Bld2016-10343 | |||||
Consolidating 25 parcels at the salt lake city airport Date: March 2, 2016 Permit type: Subdivision and condominium | Permit status: Active | Permit id: Plnsub2016-0013 | |||||
SCORE 95 Concourse c - add smoke detector and duct smoke detector as shown on drawings. Install suppression system in it room. Concourse d - add smoke detector and duct smoke detector as shown on drawings. Install suppression system in it room. Date: May 20, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03680 | |||||
SCORE 100 Repositioning of the existing airline configuration at the ticket counter. Repositioning of the tsa baggage screening equipment electrical work only. Separate building permit maybe required Date: July 22, 2016 Contractor: Boshard Electric Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-06865 | |||||
SCORE 100 Repositioning of the existing airline configuration at the ticket counter. Repositioning of the tsa baggage screening equipment electrical work only. Separate building permit maybe required Date: July 22, 2016 Contractor: Boshard Electric Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-06865 | |||||
SCORE 97 Electrical demo on store front and lamp replacement Date: July 6, 2016 Contractor: Alltech Electric Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-06351 |