ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: April 5, 2012Permit status: Completed | Permit id: 397725 | |||||
Alteration permit Date: June 23, 2011Permit status: Completed | Permit id: 330985 | |||||
Use permit Date: January 13, 2011Permit status: Completed | Permit id: 319564 | |||||
Demolition permit Date: May 3, 2016Permit status: Expired | Permit id: 684638 | |||||
Administrative permit Date: May 6, 2013Permit status: Completed | Permit id: 462334 | |||||
Plumbing permit Date: August 1, 2012Permit status: Completed | Permit id: 419750 | |||||
New construction permit Date: June 27, 2016Permit status: Active | Permit id: 682660 | |||||
Plumbing permit Date: March 9, 2016Permit status: Active | Permit id: 675239 | |||||
Zoning/use permit Date: January 28, 2016Permit status: Completed | Permit id: 642785 | |||||
Zoning permit Date: January 6, 2011Permit status: Completed | Permit id: 313013 | |||||
Permit for the relocation of lot lines to create two lots from one lot; for parcel 2 (722 n. 3rd street): an existing one story attached building for use as permitted in l-4 industrial district (use registration permit required prior to occupancy) with an existing interior parking space; for parcel 1 (724 n. 3rd street): for the erection of a third floor addition with two (2) partially covered roof terraces (above the third floor roof) accessed by open stairs from the third floor (maximum height 419") and for the erection of a partially roofed over stair above the side breezeway area as part of a three (3) story attached structure for uses as permitted in l-4 industrial district on the first floor (use registration permit required prior to occupancy) and two family dwellings on the upper floors (roof terrace accessory to the dwellings). Date: December 2, 2010Applicant: Klehr Harrison Harvey Branzburg | Permit type: Appeal | Permit status: Granted | Completion date: January 6, 2011 | Permit id: 14017 | |||||
Permit for the complete demolition of existing attached structure. For the erection of an attached structure (maximum height not to exceed 38 ft) with cellar, interior off-street parking (garage), rear decks at second and third floor level, a roof deck and roof access structure. Size and location as shown on plans. For use as single family dwelling. Date: October 27, 2015Applicant: Roger Perry, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: January 21, 2016 | Permit id: 26313 | |||||
Zoning permit Date: January 6, 2011Permit status: Completed | Permit id: 313013 | |||||
Plumbing permit Date: March 9, 2016Permit status: Active | Permit id: 675239 | |||||
Alteration permit Date: August 26, 2011Permit status: Completed | Permit id: 357260 | |||||
Electrical permit Date: April 5, 2012Permit status: Completed | Permit id: 397725 | |||||
New construction permit Date: June 27, 2016Permit status: Active | Permit id: 682660 | |||||
Demolition permit Date: May 3, 2016Permit status: Expired | Permit id: 684638 | |||||
Use permit Date: January 13, 2011Permit status: Completed | Permit id: 319564 | |||||
Plumbing permit Date: August 3, 2012Permit status: Completed | Permit id: 420179 | |||||
Zoning use permit Date: January 28, 2016Permit status: Completed | Permit id: 642785 | |||||
Administrative permit Date: May 6, 2013Permit status: Completed | Permit id: 462334 | |||||
Permit for the complete demolition of existing attached structure. For the erection of an attached structure (maximum height not to exceed 38 ft) with cellar, interior off-street parking (garage), rear decks at second and third floor level, a roof deck and roof access structure. Size and location as shown on plans. For use as single family dwelling. Date: October 27, 2015Applicant: Roger Perry, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: January 21, 2016 | Permit id: 26313 | |||||
Permit for the relocation of lot lines to create two lots from one lot; for parcel 2 (722 n. 3rd street): an existing one story attached building for use as permitted in l-4 industrial district (use registration permit required prior to occupancy) with an existing interior parking space; for parcel 1 (724 n. 3rd street): for the erection of a third floor addition with two (2) partially covered roof terraces (above the third floor roof) accessed by open stairs from the third floor (maximum height 419") and for the erection of a partially roofed over stair above the side breezeway area as part of a three (3) story attached structure for uses as permitted in l-4 industrial district on the first floor (use registration permit required prior to occupancy) and two family dwellings on the upper floors (roof terrace accessory to the dwellings). Date: December 2, 2010Applicant: Klehr Harrison Harvey Branzburg | Permit type: Appeal | Permit status: Granted | Completion date: January 6, 2011 | Permit id: 14017 | |||||
For the erection of footing and foundation only for an attached structure as per plan for a single family dwelling. No underpinning of foundation included in this permit application. Date: November 1, 2017Client: Zalavadia Milan Zalavadia Anisha | Permit type: New construction permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 818666 | |||||
SCORE 100 Lateral seal pa20171990138 (sfd)"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: July 18, 2017 Contractor: Big Dawgs Plumbing And HeatingClient: Zalavadia Milan Zalavadia Anisha | Permit type: Plumbing permit | Permit status: Active | Completion date: August 8, 2017 | Permit id: 800548 | |||||
Renovations to create (2) residential units on the 2nd and 3rd floors. Co for residential units only. Entire building to be fully sprinklered. No other work to 1st floor basement on this permit. Co and use registration req for 1st floor basement. A licensed contractor is required for all construction work. Date: June 23, 2011Client: Zalavadia Milan Zalavadia Anisha | Permit type: Alteration permit | Permit status: Completed | Completion date: November 19, 2012 | Permit id: 330985 | |||||
Parcel 2 - existing 1 story building for use as l-4 district with parking space. Date: January 13, 2011Client: Zalavadia Milan Zalavadia Anisha | Permit type: Use permit | Permit status: Completed | Completion date: March 25, 2011 | Permit id: 319564 | |||||
For the relocation of lot line to create two lots from one lot. Date: January 6, 2011Client: Zalavadia Milan Zalavadia Anisha | Permit type: Zoning permit | Permit status: Completed | Completion date: April 27, 2011 | Permit id: 313013 | |||||
For the comeplete demolition of an existing, attached, one (1) story masonry structure previously used as a garage; structure to be demolished by hand and with hand held tools only (mechanical equipment may be used for debris transport and slab removal only, no mechanical demo of structure above grade); work also includes removal of foundation system and basement slab; pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. Asbestos abatement required a covered walkway or sidewalk closure shall be required within 7 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. Section a-303. 2 waived due to zba approval of zoning under ap#642785. Special inspections required due to occupied buildings w in safety zone permit received from downstairs Date: August 21, 2017Client: Zalavadia Milan Zalavadia Anisha | Permit type: Demolition permit | Permit status: Completed | Completion date: September 13, 2017 | Permit id: 787241 | |||||
SCORE 93 Complete demolition of an existing semi-detached (alley on one side) one story, masonry and wood garage structure by hand methods. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. Complete sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. 21 day posting period waived due to zba case 26313, permit 642785 per section a-303. 2 of the philadelphia administrative code Date: May 3, 2016 Contractor: Ricco ConstructionClient: Zalavadia Milan Zalavadia Anisha | Permit type: Demolition permit | Permit status: Expired | Completion date: December 27, 2016 | Permit id: 684638 | |||||
New construction of a three story with cellar, front garage parking (existing curb cut) and pilot house to roof deck for single family. No demolion permitted this permit - separate demolition is permit required underpinning to be inspected by registered engineer as per special inspections. Must perform in safe manner and protect adjacent structure from any movements. Additonal permits required: electrical, plumbing, hvac,sprinklers. Date: June 27, 2016Client: Zalavadia Milan Zalavadia Anisha | Permit type: New construction permit | Permit status: Expired | Completion date: March 30, 2017 | Permit id: 682660 | |||||
SCORE 100 Cap san & water at curb. Seal lateral, seal fresh air inlet and remove curb trap pa1# 2016-0690524 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: March 9, 2016 Contractor: A And V Mechanical Services IncClient: Zalavadia Milan Zalavadia Anisha | Permit type: Plumbing permit | Permit status: Expired | Completion date: March 30, 2017 | Permit id: 675239 | |||||
For the complete demo of a one story garage building. The new construction of a three story single family dwelling with cellar, front garage parking(existing curb-cut)and pilot house to roof deck for use as a sfd. Date: January 28, 2016Client: Zalavadia Milan Zalavadia Anisha | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 28, 2016 | Permit id: 642785 | |||||
Amend permit number 3572 to reflect the removal of one accessible bathroom to create a pantry as per the sealed submitted plan. Call the inspector to schedule an inspection. Date: May 6, 2013Client: Zalavadia Milan Zalavadia Anisha | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 462334 | |||||
SCORE 100 Installation of 5" lateral to main sewer Date: August 3, 2012 Contractor: Christopher HeislerClient: Zalavadia Milan Zalavadia Anisha | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 6, 2013 | Permit id: 420179 | |||||
SCORE 100 Install 5x4 curb trap w fai into building 4 main drain rough plumbing for powder room 1-wc 1-lav sink 3 4 water service pipe from curb into building Date: August 1, 2012 Contractor: Christopher HeislerClient: Zalavadia Milan Zalavadia Anisha | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 6, 2013 | Permit id: 419750 | |||||
SCORE 100 100amp tempservice,4 sets of light stringers and 5 gfci circuits as per 2008 nec Date: April 5, 2012 Contractor: Christopher AdairClient: Zalavadia Milan Zalavadia Anisha | Permit type: Electrical permit | Permit status: Completed | Completion date: July 13, 2015 | Permit id: 397725 | |||||
SCORE 100 Install new 2 amp service as per 2008 nec (cc district) commercial garage Date: February 6, 2012 Contractor: Npelectric LlcClient: Zalavadia Milan Zalavadia Anisha | Permit type: Electrical permit | Permit status: Completed | Completion date: May 10, 2012 | Permit id: 386616 | |||||
Renovation of 1st floor space for office. Building shall be fully sprinklered. See use permit# 356639. Basement for mechanical only Date: August 26, 2011Client: Zalavadia Milan Zalavadia Anisha | Permit type: Alteration permit | Permit status: Completed | Completion date: June 7, 2013 | Permit id: 357260 | |||||
Erection of a proposed 3 story sfd with a cellar, an interior off street parking, rear deck at second and third floor level and a roof deck. See attached plans. Date: December 14, 2017Client: Zalavadia Milan Zalavadia Anisha | Permit type: New construction permit | Permit status: Active | Completion date: December 14, 2017 | Permit id: 834526 |