ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 98 Date: June 2, 2017 Contractor: United Contractors, IncPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-10111 | |||||
SCORE 99 Low voltage Date: September 6, 2017 Contractor: Stapleton Electric, LlcPermit status: Inspections | Current use: Commercial | Permit id: Bld2017-07805 | |||||
SCORE 100 Plumbing remodel Date: September 5, 2017 Contractor: Curtis Plumbing IncPermit type: Plumbing | Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-07798 | |||||
SCORE 99 Hvac installation Date: June 21, 2017 Contractor: United Team Mechanical, LlcPermit type: Mechanical | Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-05347 | |||||
SCORE 75 Electrical Date: August 25, 2017 Contractor: Stapleton Electric,Llc Dba S And S ElectricPermit status: Inspections | Current use: Commercial | Permit id: Bld2017-07492 | |||||
SCORE 99 Fire Date: August 9, 2017 Contractor: Quality Fire ProtectionPermit status: Inspections | Current use: Commercial | Permit id: Bld2017-06404 | |||||
SCORE 98 The scope of this project consists of renovating the interior of the existing building, as well as removing all site appurtenances which currently exist above the existing below grade parking garage, for the purpose of enhancing the structural stability of the garage and installing a waterproof membrane on top of the garage. New site facilities will then be constructed and installed on top of the garage, with the intent of serving the same purpose of the previous site facilities. The entire facility (building & site) will be completely shut down and not used by the owner or any other patrons, and closed off to the public during the building, garage rehabilitation and site construction. The project site contains an existing conditional use permit which will allow the facility to operate within its desired use when construction is complete. The project site currently exists within an historic preservation district in salt lake city. A certificate of appropriateness (petition no. Plnhlc20 Date: October 30, 2017 Contractor: United Contractors, IncPermit status: Inspections | Current use: Commercial | Permit id: Bld2017-01264 |