Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: April 27, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 268126 | |||||
New construction permit Date: August 18, 2009 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 219059 | |||||
Electrical permit Date: June 30, 2008 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Expired | Permit id: 159740 | |||||
Zoning permit Date: November 20, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 95970 | |||||
Suppression permit Date: June 28, 2011 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 267404 | |||||
Plumbing permit Date: April 20, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 269605 | |||||
Mechanical permit Date: October 4, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 297626 | |||||
Demolition permit Date: February 25, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 263872 | |||||
Suppression permit Date: January 20, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 258118 | |||||
Plumbing permit Date: December 21, 2009 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 250286 | |||||
Electrical permit Date: September 25, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Expired | Permit id: 97975 | |||||
Alteration permit Date: March 6, 2008 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Expired | Permit id: 133305 | |||||
Zoning/use permit Date: December 17, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 121882 | |||||
Permit for the relocation of lot lines to create two (2) lots from one (1) lot. Lot #1: for the complete demolition of existinag building from the lot and for the erection of a five (5) story structure max height 69 ft. For use as a nursing home (home for the aged) with a total of 62 apartments (54 one bedroom units and 8 two bedroom units) with accessory parking spaces including 5 handicap parking spaces, for the erection of three (3) free standign accessory signs (2 illuminated signs 3 ft x ft max 6 ft high (each) and 1 single externaly illuminated sign - 3 ft x 6ft and 6 ft high). Lot #2 for partial demolition of existing 3 story building and no change in existing 2 story building, both for continued use as existing nursing home (home for the aged) with 57 dwelling units (23 units with full kitchens, 25 units with partaal kitchens and 9 units with no kitchens using existing community kitchen and dining room) for a total of 57 persons,m for 27 acc parking spaces including 5 handicap Date: September 20, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Applicant: Stephen G. Pollock, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 16, 2007 | Permit id: 3294 | |||||
Permit/ certificate for the erection of a one (1) story addition (10-11"high) with a covered porch at the ground level and a roof deck above the one story roof (with 42" high railings), for the erection of a two (2) story addition (21 high) and the erection of a five (5) story stair tower (47-1" high), for use as accessory offices, meeting/activity rooms (library, arts and crafts, chapel, etc.) and other incidental uses to the existing home for the aged (57 dwelling units); for the reconfiguration of parking spaces for a new total of twenty-two (22) accessory spaces (including five (5) handicapped spaces); for the creation of an exterior ramp for deliveries only with 5high retaining walls; existing driveway access easement between lots 1 and 2 to remain as previously approved, (size and location as shown in the application). Date: December 16, 2008 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Applicant: Stephen G. Pollock, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: March 4, 2009 | Permit id: 8000 | |||||
Suppression permit Date: January 20, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 258118 | |||||
Plumbing permit Date: December 21, 2009 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 250286 | |||||
Demolition permit Date: February 25, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 263872 | |||||
Electrical permit Date: September 25, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Expired | Permit id: 97975 | |||||
Plumbing permit Date: June 15, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 285319 | |||||
New construction permit Date: August 18, 2009 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 219059 | |||||
Mechanical permit Date: October 4, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 297626 | |||||
Zoning use permit Date: December 17, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 121882 | |||||
Electrical permit Date: June 30, 2008 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Expired | Permit id: 159740 | |||||
Suppression permit Date: June 28, 2011 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 267404 | |||||
Alteration permit Date: March 6, 2008 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Expired | Permit id: 133305 | |||||
Electrical permit Date: April 27, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 268126 | |||||
Zoning permit Date: November 20, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit status: Completed | Permit id: 95970 | |||||
Permit certificate for the erection of a one (1) story addition (10-11"high) with a covered porch at the ground level and a roof deck above the one story roof (with 42" high railings), for the erection of a two (2) story addition (21 high) and the erection of a five (5) story stair tower (47-1" high), for use as accessory offices, meeting activity rooms (library, arts and crafts, chapel, etc.) and other incidental uses to the existing home for the aged (57 dwelling units); for the reconfiguration of parking spaces for a new total of twenty-two (22) accessory spaces (including five (5) handicapped spaces); for the creation of an exterior ramp for deliveries only with 5high retaining walls; existing driveway access easement between lots 1 and 2 to remain as previously approved, (size and location as shown in the application). Date: December 16, 2008 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Applicant: Stephen G. Pollock, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: March 4, 2009 | Permit id: 8000 | |||||
Permit for the relocation of lot lines to create two (2) lots from one (1) lot. Lot #1: for the complete demolition of existinag building from the lot and for the erection of a five (5) story structure max height 69 ft. For use as a nursing home (home for the aged) with a total of 62 apartments (54 one bedroom units and 8 two bedroom units) with accessory parking spaces including 5 handicap parking spaces, for the erection of three (3) free standign accessory signs (2 illuminated signs 3 ft x ft max 6 ft high (each) and 1 single externaly illuminated sign - 3 ft x 6ft and 6 ft high). Lot #2 for partial demolition of existing 3 story building and no change in existing 2 story building, both for continued use as existing nursing home (home for the aged) with 57 dwelling units (23 units with full kitchens, 25 units with partaal kitchens and 9 units with no kitchens using existing community kitchen and dining room) for a total of 57 persons,m for 27 acc parking spaces including 5 handicap Date: September 20, 2007 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Applicant: Stephen G. Pollock, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 16, 2007 | Permit id: 3294 | |||||
SCORE 100 Cap off sanitary lat Date: December 17, 2009 Contractor: Tandem Associates Inc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 16, 2010 | Permit id: 253891 | |||||
SCORE 96 Partial demolition, erect sign, home for the aged. Date: December 17, 2007 Contractor: Ballard Spahr Andrews Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 17, 2007 | Permit id: 121882 | |||||
SCORE 100 Remove 1 x 2,5 gallon underground storage tank containing no. 2 heating oil. Soil samples will be collected from the excavation and a clossure report is required upon completion. Date: February 25, 2010 Contractor: J And J Spill Service And Supplies Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Demolition permit | Permit status: Completed | Completion date: September 7, 2010 | Permit id: 263872 | |||||
SCORE 100 Installation of an automatic sprinkler system Date: June 28, 2011 Contractor: Premium Fire And Security Llc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Suppression permit | Permit status: Completed | Completion date: July 2, 2011 | Permit id: 267404 | |||||
SCORE 100 20 amp service with 72 panelboards, 791 lights fixtures, 1507 receptacles, fire alarm system as per 2008 nec and nfpa 72 (east district) Date: April 27, 2010 Contractor: Charles H Macdonald Electric I Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Electrical permit | Permit status: Completed | Completion date: August 2, 2011 | Permit id: 268126 | |||||
SCORE 100 65 wc, 65 lav, 64 shower, 65 kit sink, 12 fd five foot out Date: April 20, 2010 Contractor: Tandem Associates Inc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 4, 2011 | Permit id: 269605 | |||||
SCORE 100 Site work,8 catch basins,storm water management,and new sewer connection Date: June 15, 2010 Contractor: J F Huebner And Son Inc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 29, 2011 | Permit id: 285319 | |||||
SCORE 100 Install ductwork from 4 a. C. Units to common areas. Install exhaust fans and ductwork to senior apartments per plan. Date: October 4, 2010 Contractor: Edward B Oreilly And Assoc Inc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 2, 2011 | Permit id: 297626 | |||||
SCORE 96 Relocation of lot lines Date: November 20, 2007 Contractor: Ballard Spahr Andrews Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Zoning permit | Permit status: Completed | Completion date: November 20, 2007 | Permit id: 95970 | |||||
SCORE 100 Add additional notification appliances into units (east district) Date: September 25, 2007 Contractor: Cintas 2 Corporation Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Electrical permit | Permit status: Expired | Completion date: September 25, 2007 | Permit id: 97975 | |||||
SCORE 93 Interior alterations to create two mechanical rooms Date: March 6, 2008 Contractor: J J Deluca Co Inc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Alteration permit | Permit status: Expired | Completion date: December 31, 2008 | Permit id: 133305 | |||||
SCORE 100 Remove existing fire alarm equipment(system) & replace with new fire alarm system, control panels, batterys, booster panels, control modules, 125 smoke detectors, 71 audio devices, 42 av devices, 95 speaker, 14 strobes wall, 4 door holder as per nfpa72 (east district) Date: June 30, 2008 Contractor: Anmar Electrical Contractor In Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Electrical permit | Permit status: Expired | Completion date: June 30, 2008 | Permit id: 159740 | |||||
SCORE 96 Erect structure and signs for home for the aged. Date: December 17, 2007 Contractor: Ballard Spahr Andrews Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 17, 2007 | Permit id: 121881 | |||||
Replace existing riser, relocate existing sprinkler heads and add new sprinkler head within the new addition as per plans. Date: April 7, 2010 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Suppression permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 262981 | |||||
Construction of a new 5-story, 62 unit senior independent living apartment building as per plans. Notice of demolition of existing building must be posted. Demolition may not begin until september 8, 2009. Date: August 18, 2009 Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: New construction permit | Permit status: Completed | Completion date: June 30, 2011 | Permit id: 219059 | |||||
SCORE 100 For the relocation fire supression sprinkler heads in an existing system. Date: January 20, 2010 Contractor: Premium Fire And Security Llc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Suppression permit | Permit status: Completed | Completion date: August 20, 2010 | Permit id: 258118 | |||||
SCORE 100 Site work: 7 area drains, storm water management, 14 rwcs, 6" san lateral, and house trap, house drain, 3" domestic water service Date: December 21, 2009 Contractor: J F Huebner And Son Inc Client: Pilgrim Gardens Senior Housing | Client Company: Bldg B | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 16, 2011 | Permit id: 250286 |