ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, string inverter- optimizers. 08 25 17 jk waived plan review as the total continuous rated output power of the ac modules is 7. 68kw which falls below the 7. 7kw threshold for requiring plan review. Date: August 22, 2017 Contractor: Sunergy Systems IncPermit type: Electrical | Permit status: Permit closed | Completion date: September 5, 2017 | Expiration date: August 22, 2018 | Current use: Single family / duplex | Permit id: 6614818 |