Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Switch to paper on 7 29 15 interior remodel and or repair, fire blocking and upgrade as deemed necessary. Elec permit reqd. Hist dist. Interior only Date: July 15, 2015 Contractor: Old House Care Llc Permit type: Permit | Permit status: Pass | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05339 | |||||
SCORE 100 We are in the process of a plumbing inspection. While tim noticed that there was new electrical in the building. This electrical was installed before i was employed at the haven, and there was no electrical permit pulled to perform any electrical work. This permit is to have an electrical inspection performed to continue with the renovation we have going. Date: July 14, 2015 Contractor: Aw Electric Inc Permit type: Electrical | Permit status: Accepted | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05338 | |||||
SCORE 61 Plumbing permit only 2 tubs, 2 washers, 12 showers, 2 floor drains, 12 sinks, 14 basins, 14 water closets, 2 hose bibs, water piping, modify soil, waste, vent pip, shower pan, modify dwv systems Date: June 2, 2015 Contractor: My Friendly Plumber Permit type: Plumbing | Permit status: Accepted | Completion date: June 2, 2015 | Current use: Commercial | Permit id: Bld2015-03872 | |||||
SCORE 100 Replace 64 windows in apt. Bldg, see cert of appropriateness (attached) insulate attic to r-38, attic access apt #12, rmf-45, 14 unit apt bldg j. U. Ced fee waiver approved Date: February 6, 2013 Contractor: Salt Lake Community Action Program Permit type: Permit | Permit status: Completed | Completion date: February 12, 2013 | Current use: Residential | Permit id: Bld2013-00640 | |||||
SCORE 61 Switch to paper on 7/29/15 interior remodel and or repair, fire blocking and upgrade as deemed necessary. Elec permit reqd. Hist dist. Interior only Date: July 15, 2015 Contractor: Old House Care Llcgeorge House Renovation Permit type: Permit | Permit status: Inspections | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05339 | |||||
We are in the process of a plumbing inspection. While tim noticed that there was new electrical in the building. This electrical was installed before i was employed at the haven, and there was no electrical permit pulled to perform any electrical work. This permit is to have an electrical inspection performed to continue with the renovation we have going. Date: July 14, 2015 Permit type: Electrical | Permit status: Accepted | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05338 | |||||
SCORE 64 Plumbing permit only 2 tubs, 2 washers, 12 showers, 2 floor drains, 12 sinks, 14 basins, 14 water closets, 2 hose bibs, water piping, modify soil, waste, vent pip, shower pan, modify dwv systems Date: June 2, 2015 Contractor: My Friendly Plumberhaven Permit type: Plumbing | Permit status: Reviews not require | Completion date: June 2, 2015 | Current use: Commercial | Permit id: Bld2015-03872 | |||||
SCORE 99 Replace 14 interior doors to each unit. Date: May 21, 2015 Contractor: Old House Care Llc Permit type: Permit | Permit status: Closed | Completion date: June 24, 2015 | Current use: Residential | Permit id: Bld2015-03587 | |||||
SCORE 74 No buidling permit on file. Replace black pipe only Date: September 16, 2014 Contractor: Select Comfort Systems Llcthe George House Permit type: Plumbing | Permit status: Closed | Completion date: January 20, 2015 | Current use: Commercial | Permit id: Bld2014-06740 | |||||
SCORE 74 Replace existing boiler with two 245,0 btu boilers. Date: September 16, 2014 Contractor: Select Comfort Systems Llcthe George House Permit type: Mechanical | Permit status: Closed | Completion date: January 15, 2015 | Current use: Commercial | Permit id: Bld2014-06739 | |||||
Replace furnace and air conditioner. Please note: all exterior mech eqpmnt must be 4 from the property line to comply w/ slc zoning. Date: October 29, 2012 Permit type: Mechanical | Permit status: Pass | Completion date: November 14, 2012 | Current use: Residential | Permit id: Bld2012-08012 | |||||
SCORE 74 Electrical service change for multiple family dwellings (14). Date: November 30, 2009 Contractor: Millcreek Electric Co Inchelping Hand Permit type: Electrical | Permit status: Closed | Completion date: December 13, 2010 | Current use: Residential | Permit id: Bld2009-07314 | |||||
SCORE 61 Switch to paper on 7/29/15 interior remodel and or repair, fire blocking and upgrade as deemed necessary. Elec permit reqd. Hist dist. Interior only Date: July 29, 2015 Contractor: George House Renovationdan Schwartz Permit status: Inspections | Current use: Residential | Permit id: Bld2015-05339 | |||||
SCORE 69 Replace 14 interior doors to each unit. Date: June 24, 2015 Contractor: John Sargent Permit status: Closed | Current use: Residential | Permit id: Bld2015-03587 | |||||
SCORE 65 Replace furnace and air conditioner. Please note: all exterior mech eqpmnt must be 4+ from the property line to comply w/ slc zoning. Date: October 29, 2012 Contractor: Select Comfort System Llcthe Haven Permit type: Mechanical | Permit status: Closed | Completion date: November 14, 2012 | Current use: Residential | Permit id: Bld2012-08012 | |||||
SCORE 66 Replace 64 windows in apt. Bldg, see cert of appropriateness (attached) insulate attic to r-38, attic access apt #12, rmf-45, 14 unit apt bldg j. U. Ced fee waiver approved Date: February 6, 2013 Permit status: Inspections | Completion date: February 12, 2013 | Current use: Residential | Permit id: Bld2013-00640 | |||||
SCORE 59 We are in the process of a plumbing inspection. While tim noticed that there was new electrical in the building. This electrical was installed before i was employed at the haven, and there was no electrical permit pulled to perform any electrical work. This permit is to have an electrical inspection performed to continue with the renovation we have going. Date: July 14, 2015 Contractor: Aw Electric Inc.George House Renovation Permit type: Electrical | Permit status: Inspections | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05338 | |||||
SCORE 66 Replace 64 windows in apt. Bldg, see cert of appropriateness (attached) insulate attic to r-38, attic access apt #12, rmf-45, 14 unit apt bldg j. U. Ced fee waiver approved Date: February 6, 2013 Permit type: Permit | Permit status: Completed | Completion date: February 12, 2013 | Current use: Residential | Permit id: Bld2013-00640 | |||||
SCORE 74 Electrical service change for multiple family dwellings (14). Date: November 30, 2009 Contractor: Millcreek Electric Co Inchelping Hand Permit type: Electrical | Permit status: Closed | Completion date: December 13, 2010 | Current use: Residential | Permit id: Bld2009-07314 | |||||
SCORE 72 Replace furnace and air conditioner. Please note: all exterior mech eqpmnt must be 4+ from the property line to comply w slc zoning. Date: October 29, 2012 Contractor: Select Comfort System, Llcthe Haven Permit type: Mechanical | Permit status: Closed | Completion date: November 14, 2012 | Current use: Residential | Permit id: Bld2012-08012 | |||||
SCORE 66 Replace 64 windows in apt. Bldg, see cert of appropriateness (attached) insulate attic to r-38, attic access apt #12, rmf-45, 14 unit apt bldg j. U. Ced fee waiver approved Date: February 6, 2013 Permit status: Inspections | Completion date: February 12, 2013 | Current use: Residential | Permit id: Bld2013-00640 | |||||
SCORE 74 Replace existing boiler with two 245,0 btu boilers. Date: September 16, 2014 Contractor: Select Comfort Systems Llcthe George House Permit type: Mechanical | Permit status: Closed | Completion date: January 15, 2015 | Current use: Commercial | Permit id: Bld2014-06739 | |||||
SCORE 74 No buidling permit on file. Replace black pipe only Date: September 16, 2014 Contractor: Select Comfort Systems Llcthe George House Permit type: Plumbing | Permit status: Closed | Completion date: January 20, 2015 | Current use: Commercial | Permit id: Bld2014-06740 | |||||
SCORE 99 Replace 14 interior doors to each unit. Date: May 21, 2015 Contractor: Old House Care Llc Permit status: Closed | Completion date: June 24, 2015 | Current use: Residential | Permit id: Bld2015-03587 | |||||
SCORE 64 Plumbing permit only 2 tubs, 2 washers, 12 showers, 2 floor drains, 12 sinks, 14 basins, 14 water closets, 2 hose bibs, water piping, modify soil, waste, vent pip, shower pan, modify dwv systems Date: June 2, 2015 Contractor: My Friendly Plumberhaven Permit type: Plumbing | Permit status: Inspections | Completion date: June 2, 2015 | Current use: Commercial | Permit id: Bld2015-03872 | |||||
SCORE 59 We are in the process of a plumbing inspection. While tim noticed that there was new electrical in the building. This electrical was installed before i was employed at the haven, and there was no electrical permit pulled to perform any electrical work. This permit is to have an electrical inspection performed to continue with the renovation we have going. Date: July 14, 2015 Contractor: Aw Electric, Inc.George House Renovation Permit type: Electrical | Permit status: Inspections | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05338 | |||||
SCORE 61 Switch to paper on 7 29 15 interior remodel and or repair, fire blocking and upgrade as deemed necessary. Elec permit reqd. Hist dist. Interior only Date: July 15, 2015 Contractor: Old House Care Llcgeorge House Renovation Permit status: Inspections | Completion date: July 29, 2015 | Current use: Residential | Permit id: Bld2015-05339 |