ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Clear main sewer house trap from trap to street and from house trap into building. Pump out all water and sewage from basement, vacuum dry, spread Date: May 8, 2003Permit type: Stopag | Permit id: E322029 | |||||
Uncapped radiator valve at public hall, 1st story remove all work related debris Date: February 18, 2009Permit type: Plumb | Permit id: E927698 | |||||
SCORE 59 Date: September 21, 1994 Contractor: Reuben FinkelateinClient: Mark Kalton | Client Address: P.O Box 449 Brooklyn Ny 11230 | Client Phone: (718) 252-9173 | Client Company: Homeward Gardens Inc,C/o E.M Man | Permit status: Initial | Permit id: 300389103 | |||||
SCORE 100 Date: September 21, 1994 Contractor: Ira FriedmanClient: Mark Kalton | Client Address: P.O Box 449 Brooklyn Ny 11230 | Client Phone: (718) 252-9173 | Client Company: Homeward Gardens Inc,C/o E.M Man | Permit status: Initial | Permit id: 300389103 | |||||
Apt #3; repair the roof over the northeast bedroom, approx 2 sq ft remove all work related debris. Non-s. W. P. Contractor must sign a Date: September 1, 2011Permit type: Gc | Permit id: Ec06071 | |||||
Apt 1: as per the requirement contract with hpd, provide and install 4 window guards throughout entire apartment. Remove all work related debris. Date: March 27, 2013Permit type: Gc | Permit id: Ed18679 | |||||
Apt 1 >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> at the ne3 room repair approx. Total sq ft. The broken ceiling and east wall and then prime and paint appr Date: April 9, 2013Permit type: Gc | Permit id: Ed19895 | |||||
Apt 1 >>>>>>>>>>>>>>>>>>>>>>>>>>>>>> at the es1 room repair approx. Total sq ft the broken ceiling and east wall and then prime and paint approx. 4 Date: March 12, 2013Permit type: Gc | Permit id: Ed17687 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 23, 2013Permit type: Delead | Permit id: Ed21024 | |||||
Repair the roof install lb fiber glass mat /asphalt roll roofing , including ,base flashing on top of existing roofing. 7 sftremove all work Date: May 6, 2010Permit type: Gc | Permit id: Ea33941 | |||||
Apt. # 2 @ roof. Trace and repair source of roof leak into the apartment - cut out all air pockets and install new bituminous membrane cap sheet abov Date: June 19, 2014Permit type: Gc | Permit id: Ee25084 | |||||
Apt 2: as per the requirement contract with hpd, provide and install 3 window guards throughout entire apartment. Remove all work related debris. Date: September 12, 2013Permit type: Gc | Permit id: Ee05543 | |||||
Apt 2: as per the requirement contract with hpd, provide and install 1 window guard and repair 4 throughout entire apartment. Remove all work rel Date: April 10, 2013Permit type: Gc | Permit id: Ed19948 | |||||
Repair the roof install lb fiber glass mat asphalt roll roofing , including ,base flashing on top of existing roofing. 7 sftremove all work Date: May 6, 2010Permit type: Gc | Permit id: Ea33941 |