ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 70 Flat sign: 272 sqft pole sign: 78. 125 sqft Date: April 29, 2010 Contractor: Impact Signs Incoreilly Auto PartsPermit type: Sign | Permit status: Completed | Completion date: February 14, 2011 | Permit id: Bld2010-02754 | |||||
SCORE 64 Flag pole only k. A. Zone: m-1 zone. 35 flag pole a. H. Date: March 16, 2010 Contractor: Van Tassel Proctor Incoreilly Auto PartsPermit type: Permit | Permit status: Pass | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2010-01415 | |||||
SCORE 79 Clean action fire suppression system Date: December 10, 2009 Contractor: Ahern Fire Protectiono Reilly Auto PartsPermit type: Fire | Permit status: Pass | Completion date: February 3, 2010 | Current use: Commercial | Permit id: Bld2009-07627 | |||||
SCORE 79 Low voltage fire alarm for computer room Date: December 10, 2009 Contractor: Ahern Fire Protectiono Reilly Auto PartsPermit type: Low voltage | Permit status: Pass | Completion date: February 3, 2010 | Current use: Commercial | Permit id: Bld2009-07626 | |||||
SCORE 64 Fire alarm system i05 fire alarm panel & assoc horn/strobes Date: December 4, 2009Permit type: Low voltage | Permit status: Pass | Completion date: February 4, 2010 | Current use: Commercial | Permit id: Bld2009-07501 | |||||
SCORE 64 Install 12 valves & 1 backflow preventor for irrigation sprinkling system Date: November 24, 2009 Contractor: Healy Landscaping Llco Reilly Auto PartsPermit type: Plumbing | Permit status: Pass | Completion date: December 9, 2009 | Current use: Commercial | Permit id: Bld2009-07255 | |||||
SCORE 64 Install rtus, 2 furnaces, 8 unit heaters, 2 evap coolers, 16 exhaust fans. Date: November 23, 2009 Contractor: Total Air Handling Inco Reilly Auto PartsPermit type: Mechanical | Permit status: Pass | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2009-07210 | |||||
SCORE 64 Install 38 plumbing fixtures, 3 water heaters, 17 drains, 8 hose bibbs, 1 interceptor. 1/6/ gas lines added to permit, hg Date: November 16, 2009 Contractor: Bas Plumbing And Heating Llco Reilly Auto PartsPermit type: Plumbing | Permit status: Pass | Completion date: April 27, 2010 | Current use: Commercial | Permit id: Bld2009-07067 | |||||
SCORE 64 High pile storage racking Date: October 7, 2009 Contractor: Ahern Fire Protectionrbh Idaho LlcPermit type: Permit | Permit status: Completed | Completion date: May 5, 2010 | Current use: Commercial | Permit id: Bld2009-06057 | |||||
SCORE 79 Scope of work 1) general overhead sprinkler system - a. Install five (5) esfr sprinkler systems at the roof deck. Systems shall be hydraulically calculated to flow the most remote 14 sprinklers. Twelve sprinklers for the standard remote area plus two (2) below future obstructions. The systems will also be hydraulically balanced to flow the esfr systems with the in-rack/mezzanine systems. 2) oil storage area a. Class iiib liquids in plastic containers. Designed per 2007 nfpa - 16. 6. 1, fire protection scheme a. See figure 16. 6. 1. (a) & (b) for racking schemes. There is no maximum storage height other than maintaining clearance to esfr sprinklers. B. Double & single row racks - provide two levels of face and flue sprinklers - one level below each horizontal barrier. In-rack sprinklers do not need to be balanced against the overhead system since horizontal barriers are being provided above the in-rack sprinklers. In-rack sprinklers are k=8, 165 f and designed for 8 sprinklers (4 on 2 levels Date: September 30, 2009 Contractor: Ahern Fire Protectiono Reilly Auto PartsPermit type: Fire | Permit status: Pass | Completion date: February 3, 2010 | Current use: Commercial | Permit id: Bld2009-05895 | |||||
SCORE 64 Distro lines Date: August 7, 2009 Contractor: Waco Plumbing Incbuzz Oats DevelopmentPermit type: Plumbing | Permit status: Pass | Completion date: December 9, 2009 | Current use: Commercial | Permit id: Bld2009-04695 | |||||
SCORE 64 Auto parts distribution center, interior finish,. Mech, elec, plmb permits reqd. M-1 zone. Ka kb Date: July 6, 2009 Contractor: Van Tassel Proctor Inco Reilly Auto PartsPermit type: Permit | Permit status: Pass | Completion date: April 28, 2010 | Current use: Commercial | Permit id: Bld2009-03913 | |||||
SCORE 82 Install 21 tall racks - interior. T. B. Zone: a. H. Fire: t. I. Date: February 23, 2010 Contractor: Fontnaoreilly Auto Parts Phase IiPermit type: Permit | Permit status: Pass | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2010-00929 | |||||
SCORE 66 Electrical to install racks & conveyors to existing bldg. Date: January 27, 2010 Contractor: Salt Lake Electricoreilly Auto Parts Phase IiPermit type: Electrical | Permit status: Pass | Completion date: March 19, 2010 | Current use: Commercial | Permit id: Bld2010-00426 | |||||
SCORE 66 Low voltage fire alarm. Date: January 4, 2010Permit type: Low voltage | Permit status: Pass | Completion date: February 4, 2010 | Current use: Commercial | Permit id: Bld2010-00004 | |||||
SCORE 79 Power to panel agreement on file Date: December 14, 2009 Contractor: Dillman Electric Incbuzz Oates Bldg DPermit type: Electrical | Permit status: Pass | Completion date: January 20, 2010 | Current use: Commercial | Permit id: Bld2009-07684 | |||||
SCORE 82 Install racks and conveyors to existing bldg Date: November 20, 2009 Contractor: Fontnaoreilly Auto Parts Phase IiPermit type: Permit | Permit status: Pass | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2009-07181 | |||||
Bin module, racks, conveyor, and platform for auto parts distribution. 11/06/2009 Date: May 26, 2011Permit type: Permit | Permit status: Pass | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2009-06868 | |||||
SCORE 79 Elec shell & site wiring Date: September 25, 2009 Contractor: Dillman Electric Incbuzz Oates Bldg DPermit type: Electrical | Permit status: Pass | Completion date: February 3, 2010 | Current use: Commercial | Permit id: Bld2009-05841 | |||||
SCORE 66 5 underground fire lines & 6 fire hydrants Date: August 27, 2009 Contractor: Reynolds Brothers Corporationbuzz Oates Bldg DPermit type: Fire | Permit status: Pass | Completion date: December 18, 2009 | Current use: Commercial | Permit id: Bld2009-05160 | |||||
SCORE 66 New concrete tilt up office/warehouse. Not to proceed beyond footing per public utilities and corrected plan per larry b; m-1 zone, ground mounted transformer approval per plnboa2009-00856, reviewed by larry l and alan h ok to proceed beyond footing 8-11-09 lb Date: June 5, 2009Permit type: Permit | Permit status: Completed | Completion date: February 11, 2010 | Current use: Commercial | Permit id: Bld2009-03257 |