Building Permits at 608 I St Nw, Washington, DC 20001


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 608 I St Nw, Washington, DC 20001 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Two 2-inch diameter soil borings, using direct push, will be advanced to feet below grade for soil and groundwater sampling. Drilling equipment will be decontaminated between each boring. The soil boring well will be abandoned within 8 hours of installation and according to the protocols stated in the attached work plan.
Date:  September 10, 2012

Client: David Moy | Applicant: Tony Cheng; Advantage Environmental Consultants | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200451
2012/09/10095608 I St Nw Washington Dc 20001
SCORE
59
Two 2-inch diameter soil borings, using direct push, will be advanced to feet below grade for soil and groundwater sampling. Drilling equipment will be decontaminated between each boring. The soil boring well will be abandoned within 8 hours of installation and according to the protocols stated in the attached work plan.
Date:  September 10, 2012

Client: David Moy | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200451
2012/09/10059608 I St Nw, Washington, Dc 20001Tony Cheng Advantage Environmental Consultants
SCORE
59
Two 2-inch diameter soil borings, using direct push, will be advanced to feet below grade for soil and groundwater sampling. Drilling equipment will be decontaminated between each boring. The soil boring well will be abandoned within 8 hours of installation and according to the protocols stated in the attached work plan.
Date:  September 10, 2012

Client: David Moy | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200451
2012/09/10059608 I St Nw, Washington, Dc 20001Tony Cheng; Advantage Environmental Consultants
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.