ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Interior renovation to 5th floor office space. Partitions, pantry, mep and life safety atlantic media Date: March 2, 2012Client: Watergate Holdings 1, Llc | Applicant: Watergate Holdings 1, Llc; Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1205598 | |||||
Plumbing and gas Date: March 19, 2012Client: Watergate Holdings I Llc | Applicant: Michael Hill | Permit status: Permit issued | Permit id: P1203892 | |||||
Repair windows 1200. Date: March 18, 2013Client: Watergate Holdings I Llc | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1209875 | |||||
Hvac upgrade to replace chillers Date: September 18, 2013Client: Akridge Co | Applicant: Akridge Co | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1308813 | |||||
Interior demolition to existing vacant restaurant tenant space as shown on the attached demolition dwg. No structural work involved, compano cafe. Date: May 8, 2013Client: Watergate Holdings I Llc | Applicant: John Giuseppe-Ramco | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300482 | |||||
After hours work permit in conjunction with b1209875. 7pm to 7am monday through saturday and 9am to 5pm on sundays. Date: June 21, 2013Client: Watergate Holdings 1, Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300682 | |||||
Mechanical Date: September 23, 2013Client: Watergate Holdings I Llc | Applicant: Michael J Toner | Permit status: Permit issued | Permit id: M1302979 | |||||
At entrance driveway, remove and replace sidewalk, waterproofing, driveway, trench drain and install new drains at trench drain. Date: June 18, 2014Client: Watergate Holdings Llc | Applicant: Elizabeth Herrity | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1408600 | |||||
Renovations to an existing deli space for a new campono cafe on part of 1st flr. Seating 62 indoors and outdoors on private property patio as well as two exterior feature non-bearing steel frame with enclosed fire treated fire wood walls with signage to replace existing storefront entrance feature, along with ext erior lighting. All as shown on the attached plans. Date: January 9, 2014Client: Watergate Holdings I Llc | Applicant: John Giuseppe-Ramcodc | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1309837 | |||||
Alteration and renovation of existing office area located on part of the 6th floor. The project area is 2,634 sf. The work involves the demolition and construction of non-bearing walls, ceiling material, mechanical, electrical and fire elements. Date: September 10, 2014Client: Mololamken, Llp | Applicant: Ford And Associates, Llc | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1409525 | |||||
Exterior renovations to existing deck for the ancora restaurant, providing outdoor seating for 174, total occupant load of 236, installing new linear gas fire pit and new wood burning fire pit, new exterior bar and bar structure, new bocce court, associated paving and landscaping. All on private property as per the attached third party reviewed and approved plans. Ancora pavilion. Date: September 30, 2014Client: Watergate Holdings I ? Ii Llc | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1403507 | |||||
Install new business identification back-lit vertical sign campono on new feature wall at restaurant entrances as shown on the attached plans. Date: January 10, 2014Client: Watergate Holdings I Llc | Applicant: John Giuseppe-Ramco; John Giuseppe - Ramco Dc. | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300375 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilclgirb%2b22w61ntjw3vlpxh Date: March 6, 2014Client: Robert Kinkead | Applicant: Erik Adorian; Robert Kinkead; Erik Adorian | Permit type: Electrical | Permit status: Permit issued | Permit id: E11345205 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilelsda8p458ns1kzzwdqlfr Date: December 31, 2014Client: Washington Holdings | Applicant: Philip Misey; Washington Holdings; Philip Misey | Permit type: Electrical | Permit status: Permit issued | Permit id: E43831966 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50ybhagmgf3jlv Date: September 13, 2014Client: Lip Mololamken | Applicant: George Hockaday-Bey; Lip Mololamken; George Hockaday-Bey | Permit type: Electrical | Permit status: Permit issued | Permit id: E21852425 | |||||
Plumbing and gas Date: January 15, 2014Client: Watergate Holdings I Llc | Applicant: John M. Kittelberger | Permit status: Completed | Permit id: P1402568 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild%2bgkucfkqjg4nu6lg3sgji Date: September 17, 2015Client: Watergate Holdings I Lic | Applicant: Jeff Mcalister; Watergate Holdi I Lic; Jeffrey Mcalister | Permit type: Electrical | Permit status: Permit issued | Permit id: E65830058 | |||||
First extension to permit b1403507 to expire 03/30/2016. Date: October 30, 2015Client: Watergate Holdings I Llc | Applicant: John Giuseppe | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1601223 | |||||
Plumbing and gas Date: March 12, 2012Client: Watergate Holdings 1, Llc | Applicant: Neil L Nutwell | Permit status: Completed | Permit id: P1203715 | |||||
Electrical Date: March 13, 2012Client: Watergate Holdings I Llc | Applicant: Scott A Broadbent | Permit status: Completed | Permit id: E1204253 | |||||
Electrical Date: July 18, 2013Client: Watergate Holdings I Llc | Applicant: Dana E. Wood | Permit status: Permit issued | Permit id: E1306871 | |||||
Renovations to existing 6th floor office space, derains and gharavi as shown on the attached mech. Elect., fire protection, demolition, and arch. Dwg. Interior work only. No change in use. No structural work involved. Date: October 20, 2014Client: Watergate Holdings I, Llc | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1500649 | |||||
Renovation to existing 6th floor office space, fore property co. As shown on the attached mech., plumb., elect., fire protection, demolition, and arch. Dwgs. Interior work only. No change in use. No structural work involved. Date: October 23, 2014Client: Watergate Holdings I, Llc | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1500829 | |||||
Electrical Date: December 15, 2014Client: Watergate Holdings I Llc | Applicant: Gregory E Ligon | Permit status: Completed | Permit id: E1501878 | |||||
Electrical Date: January 13, 2014Client: Watergate Holdings I Llc | Applicant: Richard D Filomena | Permit status: Completed | Permit id: E1402547 | |||||
Mechanical Date: February 3, 2014Client: Watergate Holdings I Llc | Applicant: Michael J Toner | Permit status: Completed | Permit id: M1401072 | |||||
Plumbing and gas Date: December 18, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1502117 | |||||
SCORE 96 Electrical Date: March 13, 2012 Contractor: Scott A BroadbentClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1204253 | |||||
SCORE 96 Electrical Date: March 13, 2012 Contractor: Scott A BroadbentClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1204253 | |||||
SCORE 96 Electrical Date: March 13, 2012 Contractor: Scott A BroadbentClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1204253 | |||||
SCORE 96 Electrical Date: March 15, 2012 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1204369 | |||||
SCORE 62 Interior renovation to 5th floor office space. Partitions, pantry, mep and life safety atlantic media Date: March 2, 2012Client: Watergate Holdings 1, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1205598 | |||||
SCORE 98 Plumbing and gas Date: March 19, 2012 Contractor: Michael HillClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1203892 | |||||
Repair windows 1200. Date: March 18, 2013Client: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209875 | |||||
SCORE 86 Electrical Date: September 23, 2013 Contractor: Dana E. WoodClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1308619 | |||||
SCORE 92 Mechanical Date: September 23, 2013 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: M1302979 | |||||
SCORE 92 Mechanical Date: July 18, 2013 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: M1302302 | |||||
SCORE 96 Plumbing and gas Date: December 23, 2014 Contractor: Mark F SchweberClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502271 | |||||
SCORE 96 Electrical Date: March 15, 2012 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1204369 | |||||
SCORE 93 Plumbing and gas Date: January 15, 2014 Contractor: John M. KittelbergerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1402568 | |||||
Plumbing and gas Date: September 12, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1408546 | |||||
Plumbing and gas Date: March 19, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1404107 | |||||
SCORE 96 Electrical Date: January 13, 2015 Contractor: Ralph E. JacksonClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1502455 | |||||
SCORE 92 Electrical Date: March 26, 2015 Contractor: John A CarignanClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1504397 | |||||
Plumbing and gas Date: September 14, 2015Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1509028 | |||||
SCORE 96 Electrical Date: September 16, 2015 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1509350 | |||||
SCORE 82 Plumbing and gas Date: July 21, 2016 Contractor: Tim ParhamClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1608042 | |||||
SCORE 96 Electrical Date: July 20, 2016 Contractor: Bernard G KalbClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1608314 | |||||
Plumbing and gas Date: July 20, 2016Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1607987 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50ydvs7xk71lje Date: January 8, 2015 Contractor: Kurt Pierce Mololamken Llp Kurt PierceClient: Mololamken Llp | Permit type: Electrical | Permit status: Completed | Permit id: E72954105 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilclgirb%2b22w61ntjw3vlpxh Date: March 6, 2014 Contractor: Erik Adorian Robert Kinkead Erik AdorianClient: Robert Kinkead | Permit type: Electrical | Permit status: Permit issued | Permit id: E11345205 | |||||
SCORE 93 Alteration and renovation of existing office area located on part of the 6th floor. The project area is 2,634 sf. The work involves the demolition and construction of non-bearing walls, ceiling material, mechanical, electrical and fire elements. Date: September 10, 2014 Contractor: Ford And Associates LlcClient: Mololamken, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1409525 | |||||
SCORE 56 Install new business identification back-lit vertical sign campono on new feature wall at restaurant entrances as shown on the attached plans. Date: January 10, 2014 Contractor: John Giusepperamco John Giuseppe Ramco DcClient: Watergate Holdings I Llc | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300375 | |||||
SCORE 93 After hours work permit in conjunction with b1209875. 7pm to 7am monday through saturday and 9am to 5pm on sundays. Date: June 21, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Watergate Holdings 1, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300682 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilevsbxwapda0fd25riysmfl Date: January 14, 2015 Contractor: Richard Collins Lincoln Properties Robert W DikeClient: Lincoln Properties | Permit type: Electrical | Permit status: Permit issued | Permit id: E74107981 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50ybhagmgf3jlv Date: September 13, 2014Client: Lip Mololamken | Permit type: Electrical | Permit status: Permit issued | Permit id: E21852425 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilelsda8p458ns1kzzwdqlfr Date: December 31, 2014 Contractor: Philip Misey Washington Holdings Philip MiseyClient: Washington Holdings | Permit type: Electrical | Permit status: Permit issued | Permit id: E43831966 | |||||
SCORE 56 Interior renovation to 5th floor office space. Partitions, pantry, mep and life safety atlantic media Date: March 2, 2012Client: Watergate Holdings 1, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1205598 | |||||
SCORE 98 Plumbing and gas Date: March 19, 2012 Contractor: Michael HillClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1203892 | |||||
SCORE 86 Electrical Date: September 23, 2013 Contractor: Dana E. WoodClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1308619 | |||||
SCORE 92 Mechanical Date: July 18, 2013 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: M1302302 | |||||
Repair windows 1200. Date: March 18, 2013Client: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209875 | |||||
Plumbing and gas Date: September 12, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1408546 | |||||
Plumbing and gas Date: March 19, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1404107 | |||||
SCORE 96 Plumbing and gas Date: December 23, 2014 Contractor: Mark F SchweberClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502271 | |||||
SCORE 93 Plumbing and gas Date: January 15, 2014 Contractor: John M. KittelbergerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1402568 | |||||
SCORE 82 Plumbing and gas Date: July 21, 2016 Contractor: Tim ParhamClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1608042 | |||||
Plumbing and gas Date: July 20, 2016Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1607987 | |||||
SCORE 62 Interior renovation to 7th floor office space. Partitions, furniture, mechanical, electrical and life safety. 3224 square feet. Gray plant mooty Date: July 18, 2016Client: Watergate Holdings 1, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1608855 | |||||
SCORE 62 Interior demolition to 7th floor office space. No structural. 35 square feet. Gray plant mooty Date: May 23, 2016Client: Watergate Holdings 1, Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600584 | |||||
SCORE 96 Plumbing and gas Date: December 23, 2014 Contractor: Mark F SchweberClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502271 | |||||
SCORE 93 Plumbing and gas Date: January 15, 2014 Contractor: John M. KittelbergerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1402568 | |||||
Plumbing and gas Date: September 12, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1408546 | |||||
SCORE 96 Plumbing and gas Date: July 20, 2016 Contractor: Andrew WeirClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1607987 | |||||
SCORE 56 Hvac upgrade to replace chillers Date: September 18, 2013 Contractor: Akridge CoClient: Akridge Co | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1308813 | |||||
SCORE 93 Interior demolition to existing vacant restaurant tenant space as shown on the attached demolition dwg. No structural work involved, compano cafe. Date: May 8, 2013 Contractor: John GiusepperamcoClient: Watergate Holdings I Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300482 | |||||
SCORE 70 Renovations to an existing deli space for a new campono cafe on part of 1st flr. Seating 62 indoors and outdoors on private property patio as well as two exterior feature non-bearing steel frame with enclosed fire treated fire wood walls with signage to replace existing storefront entrance feature, along with ext erior lighting. All as shown on the attached plans. Date: January 9, 2014 Contractor: John GiusepperamcodcClient: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1309837 | |||||
SCORE 93 Exterior renovations to existing deck for the ancora restaurant, providing outdoor seating for 174, total occupant load of 236, installing new linear gas fire pit and new wood burning fire pit, new exterior bar and bar structure, new bocce court, associated paving and landscaping. All on private property as per the attached third party reviewed and approved plans. Ancora pavilion. Date: September 30, 2014 Contractor: John GiusepperamcoClient: Watergate Holdings I ? Ii Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1403507 | |||||
SCORE 93 At entrance driveway, remove and replace sidewalk, waterproofing, driveway, trench drain and install new drains at trench drain. Date: June 18, 2014 Contractor: Elizabeth HerrityClient: Watergate Holdings Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1408600 | |||||
SCORE 56 Install new business identification back-lit vertical sign campono on new feature wall at restaurant entrances as shown on the attached plans. Date: January 10, 2014 Contractor: John Giusepperamco; John Giuseppe Ramco DcClient: Watergate Holdings I Llc | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300375 | |||||
SCORE 62 Interior renovation to 5th floor office space. Partitions, pantry, mep and life safety atlantic media Date: March 2, 2012Client: Watergate Holdings 1, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1205598 | |||||
SCORE 96 Electrical Date: March 15, 2012 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1204369 | |||||
SCORE 98 Plumbing and gas Date: March 19, 2012 Contractor: Michael HillClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1203892 | |||||
SCORE 93 After hours work permit in conjunction with b1209875. 7pm to 7am monday through saturday and 9am to 5pm on sundays. Date: June 21, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Watergate Holdings 1, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300682 | |||||
SCORE 86 Electrical Date: September 23, 2013 Contractor: Dana E. WoodClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1308619 | |||||
SCORE 92 Mechanical Date: July 18, 2013 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: M1302302 | |||||
SCORE 92 Mechanical Date: September 23, 2013 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: M1302979 | |||||
SCORE 93 Alteration and renovation of existing office area located on part of the 6th floor. The project area is 2,634 sf. The work involves the demolition and construction of non-bearing walls, ceiling material, mechanical, electrical and fire elements. Date: September 10, 2014 Contractor: Ford And Associates, LlcClient: Mololamken, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1409525 | |||||
Plumbing and gas Date: March 19, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1404107 | |||||
Plumbing and gas Date: September 12, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1408546 | |||||
SCORE 96 Plumbing and gas Date: December 23, 2014 Contractor: Mark F SchweberClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502271 | |||||
SCORE 93 Plumbing and gas Date: January 15, 2014 Contractor: John M. KittelbergerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1402568 | |||||
SCORE 59 Interior only demolition to non-structural elements on part of second floor. Date: August 3, 2015 Contractor: Na Atlantic MediaClient: Na Atlantic Media | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500752 | |||||
SCORE 93 Renovations to existing ancora restaurant with 177 seats & 202 occupancy load on the ground floor (1st flr.) and basement level b-2 level as shown on the attached third party reviewed and approved mech., plumb., elect., food service, fire protection, demolition and architectural dwgs. Interior work only. No structural work involved. No change in use. Date: August 13, 2015 Contractor: John GiusepperamcoClient: Watergate Holdings I ? Ii Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1403505 | |||||
SCORE 93 Revision to bldg. Permit b1505075 to show design changes to electrical plans as per the attached third party reviewed and approved e401, e601 and e602 by ibts. One set of the previous approved elect. Plans attached as reference along with written narrative of changes made. Interior work only. No arch., mech. Plumb., struct. Work involved. Date: June 2, 2015 Contractor: John GiusepperamcoClient: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1508294 | |||||
SCORE 93 Landlord upgrades to electrical service at the watergate building, including replacement of existing 40 amp switchboard #1 with new switchgear phase i, replace ex. 20 amp bus duct from garage to 12th fl. Wit n ew, replace retail service switch and ex. Motor control center, replace pepco service entrance fee, all as per the attached third party approved electrical dwgs. By ibts. Interior work only. Date: March 17, 2015 Contractor: John GiusepperamcoClient: Watergate Holdings I, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1505075 | |||||
SCORE 96 Electrical Date: January 13, 2015 Contractor: Ralph E. JacksonClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1502456 | |||||
SCORE 92 Electrical Date: March 26, 2015 Contractor: John A CarignanClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1504397 | |||||
SCORE 96 Electrical Date: September 16, 2015 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1509350 | |||||
Plumbing and gas Date: September 14, 2015Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1509028 | |||||
SCORE 62 Interior demolition to 7th floor office space. No structural. 35 square feet. Gray plant mooty Date: May 23, 2016Client: Watergate Holdings 1, Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600584 | |||||
SCORE 62 Interior renovation to 7th floor office space. Partitions, furniture, mechanical, electrical and life safety. 3224 square feet. Gray plant mooty Date: July 18, 2016Client: Watergate Holdings 1, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1608855 | |||||
SCORE 56 Renovations are shown to office space located on the 7th floor that is being divided into two separate offices for akridge by installing new demising wall and are labeled suite a and suite b mechanical, electrical, fire protection, demolition, and arch. Interior work only. No change in use. No structural work involved. Suite a 2972 sf suite b 4065 sf Date: June 6, 2016 Contractor: Watergate Holdings I Llc; John GiusepperamcoClient: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1607968 | |||||
SCORE 96 Electrical Date: July 20, 2016 Contractor: Bernard G KalbClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1608316 | |||||
SCORE 96 Electrical Date: July 20, 2016 Contractor: Bernard G KalbClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1608314 | |||||
SCORE 96 Plumbing and gas Date: July 20, 2016 Contractor: Andrew WeirClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1607987 | |||||
SCORE 82 Plumbing and gas Date: July 21, 2016 Contractor: Tim ParhamClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1608042 | |||||
SCORE 56 Alterations to 9,4 sf of first floor entrance faade and lobby as well as a new fire rated corridor on ground floor. Date: January 31, 2017 Contractor: Bradley Holdings; David Fontana MscClient: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1610253 | |||||
SCORE 95 Body of work: cars 1-3, 5-7: modernize existing elevators, governors, roller guides, door equipment and fixtures w like for like equipment . No hoist way building changes. Add new holister hitney rope grippers. Car 4 modernize existing elevator, governor, roller guides, door equipment and fixtures w like for like equipment. Replace existing machine w otis gearless machine. Add (1) stop at existing roof level. Date: May 31, 2017 Contractor: Otis Elevator CompanyClient: Watergate Holdings, Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1701796 | |||||
Plumbing and gas Date: May 30, 2017Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1706229 | |||||
Plumbing and gas Date: March 24, 2017Client: Sheldon K S E Gottlieb | Permit status: Permit issued | Permit id: P1704652 | |||||
SCORE 96 Plumbing and gas Date: February 6, 2017 Contractor: Robert MarchessaultClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1703285 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilclgirb%2b22w61ntjw3vlpxh Date: March 6, 2014 Contractor: Erik Adorian; Robert Kinkead; Erik AdorianClient: Robert Kinkead | Permit type: Electrical | Permit status: Permit issued | Permit id: E11345205 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilelsda8p458ns1kzzwdqlfr Date: December 31, 2014 Contractor: Philip Misey; Washington Holdings; Philip MiseyClient: Washington Holdings | Permit type: Electrical | Permit status: Permit issued | Permit id: E43831966 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50ybhagmgf3jlv Date: September 13, 2014Client: Lip Mololamken | Permit type: Electrical | Permit status: Permit issued | Permit id: E21852425 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50ydvs7xk71lje Date: January 8, 2015 Contractor: Kurt Pierce; Mololamken Llp; Kurt PierceClient: Mololamken Llp | Permit type: Electrical | Permit status: Completed | Permit id: E72954105 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilevsbxwapda0fd25riysmfl Date: January 14, 2015Client: Lincoln Properties | Permit type: Electrical | Permit status: Permit issued | Permit id: E74107981 | |||||
SCORE 100 First extension to permit b1403507 to expire 03/30/2016. Date: October 30, 2015 Contractor: John GiuseppeClient: Watergate Holdings I Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601223 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild%2bgkucfkqjg1goudbthtvg Date: February 2, 2016Client: Watergate Holdings I Llc Watergate Holdings I Llc | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P88004298 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild%2bgkucfkqjg4nu6lg3sgji Date: February 2, 2016Client: Watergate Holdings I Lic | Permit type: Electrical | Permit status: Completed | Permit id: E65830058 | |||||
SCORE 100 Interior demolition partial first floor Date: July 11, 2017 Contractor: George DelgadoClient: Watergate Holdings Ii Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1700554 | |||||
SCORE 100 Partial 1st floor demolition Date: June 30, 2017 Contractor: George DelgadoClient: Watergate Holdings Ii Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1700555 | |||||
SCORE 88 Plumbing and gas Date: March 12, 2012 Contractor: Neil L NutwellClient: Watergate Holdings 1, Llc | Permit status: Completed | Permit id: P1203715 | |||||
SCORE 88 Plumbing and gas Date: March 12, 2012 Contractor: Neil L NutwellClient: Watergate Holdings 1, Llc | Permit status: Completed | Permit id: P1203715 | |||||
SCORE 88 Plumbing and gas Date: March 12, 2012 Contractor: Neil L NutwellClient: Watergate Holdings 1, Llc | Permit status: Completed | Permit id: P1203715 | |||||
SCORE 86 Electrical Date: July 18, 2013 Contractor: Dana E. WoodClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1306871 | |||||
SCORE 86 Electrical Date: July 18, 2013 Contractor: Dana E. WoodClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1306871 | |||||
SCORE 86 Plumbing and gas Date: December 23, 2014 Contractor: William P SaurestClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502274 | |||||
SCORE 96 Electrical Date: December 15, 2014 Contractor: Gregory E LigonClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1501878 | |||||
SCORE 96 Electrical Date: December 15, 2014 Contractor: Gregory E LigonClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1501878 | |||||
SCORE 86 Plumbing and gas Date: December 23, 2014 Contractor: William P SaurestClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502274 | |||||
SCORE 86 Plumbing and gas Date: December 23, 2014 Contractor: William P SaurestClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502274 | |||||
SCORE 93 Renovation to existing 6th floor office space, fore property co. As shown on the attached mech., plumb., elect., fire protection, demolition, and arch. Dwgs. Interior work only. No change in use. No structural work involved. Date: October 23, 2014 Contractor: John GiusepperamcoClient: Watergate Holdings I, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1500829 | |||||
SCORE 96 Electrical Date: December 15, 2014 Contractor: Gregory E LigonClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1501878 | |||||
SCORE 86 Plumbing and gas Date: December 23, 2014 Contractor: William P SaurestClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: P1502274 | |||||
SCORE 93 Renovations to existing 6th floor office space, derains and gharavi as shown on the attached mech. Elect., fire protection, demolition, and arch. Dwg. Interior work only. No change in use. No structural work involved. Date: October 20, 2014 Contractor: John GiusepperamcoClient: Watergate Holdings I, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1500649 | |||||
SCORE 96 Electrical Date: January 13, 2014 Contractor: Richard D FilomenaClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1402547 | |||||
SCORE 96 Electrical Date: January 13, 2014 Contractor: Richard D FilomenaClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1402547 | |||||
SCORE 96 Electrical Date: January 13, 2014 Contractor: Richard D FilomenaClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: E1402547 | |||||
SCORE 92 Mechanical Date: February 3, 2014 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: M1401072 | |||||
SCORE 92 Mechanical Date: February 3, 2014 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: M1401072 | |||||
SCORE 92 Mechanical Date: February 3, 2014 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: M1401072 | |||||
SCORE 92 Mechanical Date: February 3, 2014 Contractor: Michael J TonerClient: Watergate Holdings I Llc | Permit status: Completed | Permit id: M1401072 | |||||
Plumbing and gas Date: December 18, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1502117 | |||||
Plumbing and gas Date: December 18, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1502117 | |||||
Plumbing and gas Date: December 18, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1502117 | |||||
Plumbing and gas Date: December 18, 2014Client: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: P1502117 | |||||
SCORE 96 Electrical Date: July 29, 2016 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1608649 | |||||
SCORE 96 Electrical Date: July 29, 2016 Contractor: Philip G DonnellyClient: Watergate Holdings I Llc | Permit status: Permit issued | Permit id: E1608649 |