ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Aecom on behalf of pepco, will be collecting sediment samples in the anacosita river under the direction of ddoe (contact richard jackson). Sediment sampling will be conducted in accordance with permits issued by us army corps of engineers (usace), national park service (nps), and ddoe. A temporary sediment sample process and staging area will be required along the shoreline. Kingman island park on the attached figure has been identified as the most feasible location. This serves as an application for the construction of the temporary staging area. Date: June 7, 2013Client: Living Classrooms National Captial Reg | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1307613 | |||||
Aecom on behalf of pepco, will be collecting sediment samples in the anacosita river under the direction of ddoe (contact richard jackson). Sediment sampling will be conducted in accordance with permits issued by us army corps of engineers (usace), national park service (nps), and ddoe. A temporary sediment sample process and staging area will be required along the shoreline. Kingman island park on the attached figure has been identified as the most feasible location. This serves as an application for the construction of the temporary staging area. Date: June 7, 2013Client: Living Classrooms National Captial Reg | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307613 | |||||
Aecom on behalf of pepco, will be collecting sediment samples in the anacosita river under the direction of ddoe (contact richard jackson). Sediment sampling will be conducted in accordance with permits issued by us army corps of engineers (usace), national park service (nps), and ddoe. A temporary sediment sample process and staging area will be required along the shoreline. Kingman island park on the attached figure has been identified as the most feasible location. This serves as an application for the construction of the temporary staging area. Date: June 7, 2013Client: Living Classrooms National Captial Reg | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307613 | |||||
SCORE 59 Special event roc race 1 10x tent assemble truss 30x ft x 61/2 1 10x tent lighting is 5 watts cortz 3 20x tent 12 total generators on site deisel fuel only 65 -1250 ft. Side wall Date: July 25, 2016 Contractor: Johnathan Race Go VaviClient: Johnathan Race Go Vavi | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600176 | |||||
SCORE 56 Special events kingman island bluegrass festival 3 20x tents 2 20x1 tents 2 stages 7 10x tents Date: April 23, 2015 Contractor: Bryant CurryClient: Kingman Island Bluegrass Festival | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1500099 | |||||
SCORE 56 Special event kingman island bluegrass festival 4 20x no generators Date: April 29, 2016Client: Bryant Curry Living Classrooms Of The National Capital Regional | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600117 | |||||
SCORE 56 On behalf of pepco, aecom will be collecting sediment samples in the anacosita river under the direction of doee, contact apurva patil. Sediment sampling will be conducted in accordance with permits issued by us army corps of engineers, national park service, and district department of energy and environment. A temporary sediment sample process and staging area will be required along the shoreline. Kingman island park on the attached figure has been identified as the most feasible location. The proposed staging area will consist of plastic, straw bales, and sand bags. This serves as an application for the constuction of the temporary staging area. Date: February 27, 2017Client: Living Classrooms National Capital Region | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1705170 | |||||
SCORE 56 Special event kingman island bluegrass and folk festival 2017 2 x 14 tent 1 x tent 1 12 x 12 tent 1 5. 5w generator 6 x tent 1 x tent 1 32 stageline unit - 1 1 2 kw generator 1 x tent 11 x tent sl 1 stage line unit - 1 1 kw generator 1 x tent 1 x tent apex 24 stage line unit Date: May 11, 2017Client: Lee Cain Living Classrooms Of The National Capital Region | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1700118 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild%2bzwozeixnvjd6djhzka7%2b Date: July 27, 2016 Contractor: Gregory Birckhead; Jonathan Race; Michael BellClient: Jonathan Race | Permit type: Electrical | Permit status: Permit issued | Permit id: E27448904 |