Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (rcagi-30) located in the parking lane of 1st st nw at the corner of 1st st nw and milmarson pl nw, and west of the listed property (5717 1st st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. Se Date: October 2, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117037 | |||||
SCORE 55 Roll off debris container Contractor: Marjorie Temple Permit status: Notpaid | Expiration date: December 24, 2016 | Permit id: 0 | |||||
SCORE 55 Roll off debris container Contractor: Marjorie Temple Permit status: Not paid | Expiration date: December 24, 2016 | Permit id: 0 | |||||
SCORE 55 Roll off debris container Contractor: Marjorie Temple Permit status: Notpaid | Expiration date: December 24, 2016 | Permit id: 0 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (rcagi-30) located in the parking lane of 1st st nw at the corner of 1st st nw and milmarson pl nw, and west of the listed property (5717 1st st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. Se Date: October 2, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117037 | |||||
SCORE 79 Construction staging area Date: December 14, 2015 Contractor: Mark Fletcher Salut, Inc Permit status: Permit expired | Expiration date: January 16, 2016 | Permit id: Pa10223517 | |||||
SCORE 55 Roll off debris container Contractor: Marjorie Temple Permit status: Not paid | Expiration date: December 24, 2016 | Permit id: 0 |