Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Construction of (1) alley permeable pavement facility, app-1001, as part of the dccr green infrastructure rc-a project phase 2 to include (1) section of permeable alley, (1) section non-permeable alley, (1) driveway replacement, and (1) lateral connection over 4" pipe. Occupancy application is 10458613. Date: August 14, 2017 Contractor: Michael Johnson Client: Commun-Et Llc | Permit type: Paving; alley(s), paving; alley(s) (porous/pervious), paving; driveway(s) repair or replace, excavation; sewer lateral connection over 4" pipe (trench) | Permit status: Revise and resubmit | Expiration date: February 5, 2018 | Permit id: 0 | |||||
SCORE 95 Paving; alley(s), paving; alley(s) (porous pervious), paving; driveway(s) repair or replace, excavation; sewer lateral connection over 4" pipe (trench) Contractor: Michael Johnson Permit status: 10 | Expiration date: February 5, 2018 | Permit id: 0 | |||||
SCORE 79 Construction of (1) alley permeable pavement facility, app-1001, as part of the dccr green infrastructure rc-a project phase 2 to include (1) section of permeable alley, (1) section non-permeable alley, (1) driveway replacement, and (1) lateral connection over 4" pipe. Occupancy application is 10458613. Contractor: Communet Llc Permit status: Revise and resubmit | Expiration date: February 5, 2018 | Permit id: 0 |