ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 Int only office space, mech elec plmbg permits reqd, note: the clean rooms are not included with this permit t. B. A. H. D. W. Date: April 18, 2014 Contractor: Tom Stuart Construction, Inc.Brady Health LinePermit status: Closed | Completion date: September 5, 2014 | Current use: Commercial | Permit id: Bld2014-02568 | |||||
SCORE 64 Low voltage alarm d. W. Date: May 15, 2014Permit type: Low voltage | Permit status: Closed | Completion date: September 5, 2014 | Current use: Commercial | Permit id: Bld2014-03306 | |||||
SCORE 64 This is an existing building with an existing fire sprinkler system, offices and clean room are being added. Plan is to come off existing system. Date: May 27, 2014 Contractor: Brady Health Line T.IPermit type: Fire | Permit status: Closed | Completion date: September 5, 2014 | Current use: Commercial | Permit id: Bld2014-03588 | |||||
SCORE 59 23-fixtures Date: June 18, 2014Permit type: Plumbing | Permit status: Closed | Completion date: September 5, 2014 | Current use: Commercial | Permit id: Bld2014-04247 | |||||
SCORE 64 Electrical tenant improvement Date: June 18, 2014 Contractor: Jp Electricalbrady Health LinePermit type: Electrical | Permit status: Closed | Completion date: September 5, 2014 | Current use: Commercial | Permit id: Bld2014-04284 | |||||
SCORE 59 Assemble modular clean room inside existing warehouse, elec permit reqd (value of clean room kit is in the previously permitted ti package, this value is for labor to assemble it) t. B. Same use inside existing structure d. W. Date: June 24, 2014 Contractor: Tom Stuart Construction, Inc.Bradyhealth LinePermit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-04423 |