Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a photovoltaic system ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2014 | Expiration date: June 26, 2015 | Current use: Single family / duplex | Permit id: 6424641 | |||||
SCORE 100 Add new circuits for hvac equipment. Extend existing circuit for outdoor gfci ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 17, 2014 | Expiration date: May 19, 2015 | Current use: Single family / duplex | Permit id: 6418562 | |||||
SCORE 95 Install piping for heat pumps ![]() ![]() Applicant: Integrity Energy Systems Llc | Permit type: Refrigeration | Permit status: Permit closed | Completion date: July 8, 2014 | Expiration date: November 21, 2015 | Current use: Single family / duplex | Permit id: 6419023 | |||||
SCORE 95 Install air handler & heat pump ![]() ![]() Applicant: Integrity Energy Systems Llc | Permit type: Mechanical | Permit status: Permit closed | Completion date: July 8, 2014 | Expiration date: November 21, 2015 | Current use: Single family / duplex | Permit id: 6419020 |