Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wnc aids project-bus shelter Date: August 4, 2009 Permit type: Accessory structure | Permit status: Closed | Permit id: 09-03430 | |||||
Wnc aids project Date: July 10, 2008 Permit status: Closed | Permit id: 08-01689 | |||||
Hi-tech,hi-touch occupancy permit Date: July 26, 2007 Permit status: Closed | Permit id: 06-05096 | |||||
SCORE 100 Install 2 ton heat pump, reconnect electrical, like for like on ground Date: May 18, 2015 Contractor: Gentry Heating Inc Permit type: Multi-trade | Permit status: Issued | Permit id: 15-06543 | |||||
SCORE 95 Wnc aids project Client: Wnc Aids Project | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01689 | Parcel: 22089 | |||||
SCORE 100 Wnc aids project Client: Wnc Aids Project | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01689 | Parcel: 22089 | |||||
SCORE 100 Wnc aids project Client: Wnc Aids Project | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01689 | Parcel: 22089 | |||||
SCORE 100 Wnc aids project Client: Wnc Aids Project | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01689 | Parcel: 22089 | |||||
Bus shelter Value: $1,110 Client: Wnc Aids Project-Bus Shel | Permit type: Com: accessory structure | Permit status: Closed | Current use: Commercial | Permit id: 09-03430 | Parcel: 22089 | |||||
SCORE 100 Install 5 ton air conditioner and coil, reconnect electrical like for like change out Date: August 14, 2015 Contractor: Gentry Heating Inc Client: Wnc Aids Foundation | Permit type: Com: multi-trade | Permit status: Finaled | Current use: Commercial | Permit id: 15-10345 | Parcel: 220891 | |||||
SCORE 100 Install 2 ton heat pump, reconnect electrical, like for like on ground Date: August 5, 2015 Contractor: Gentry Heating Inc Client: Wnc Aids Foundation | Permit type: Com: multi-trade | Permit status: Finaled | Current use: Commercial | Permit id: 15-06543 | Parcel: 220891 | |||||
Tech,hi-touch occupancy permit Client: Hi-Tech,Hi-Touch Occup | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 06-05096 | Parcel: 22089 | |||||
SCORE 100 Com: multi-trade Contractor: Gentry Heating Inc Permit status: Finaled | Permit id: 15-10345 | Parcel: 220891 | |||||
October 18, 2006 11:12:33 am pdolen hi-tech, hi-touch occupancy permit; july 26, 2007 2:20:48 pm scarver hi-tech, hi-touch occupancy permit;scc; no change of use.; moving back in to existing building not a change of use fire marshal? S office plan review comments read attached fire prevention comment sheet the approved plans with the attached plan review comments are required to be on the job site at all times. Call for all fire inspections at 828-redacted phone number between the hours of 8: and 9: for a same day inspection. All calls received past 9: am will be scheduled for the next business day. Fire prevention plan review questions may also be directed to this phone number.: the contractor and any affected subcontractor(s) are expected to read and comply with the fire code, all the plan review comments, and are subject to any needed correction orders per ncgs 160a-417 thru 425. Your permit must be posted at the job site at all times or a 100. Stop order fine will be assessed. Ther Permit type: Permits - historical | Permit status: Closed | Permit id: 06-05096 | Parcel: 22089 | |||||
March 24, 2008 2:32:01 pm ssalyer commercial interior renovations for wnc aids project;sls; july 10, 2008 7:47:44 pm scarver. Commercial interior renovations for wnc aids project; building inspections contact - gary stamey redacted phone number electrical inspections contact - larry davis redacted phone number plumbing inspections contact - alec arthur redacted phone number mechanical inspections contact - alec arthur redacted phone number all subcontractors need to complete trade application for project. Subcontractors need to either visit the permit office or fax copy of application to (828)redacted phone number for activation of electrical, plumbing & mechancial permits. Building safety review comments the approved plans with the attached review comments are required to be at the job site for use by the field inspector(s) at all times. The building permit is required to be posted at the jobsite at all times. Failure to post approved permits & plans at site is a 75 f Permit type: Permits - historical | Permit status: Closed | Permit id: 08-01689 | Parcel: 22089 | |||||
July 9, 2009 1:17:05 pm scarver. Building of a bus shelter through top a stop program;scc; received application and site plans. July 13, 2009 3:05:39 pm soconner.; gave application and site plans to chuck watson for review. July 13, 2009 3:06:04 pm soconner.; zoning approval for the construction of a square foot bus shelter provided by the "top a stop" program. July 16, 2009 9:50:35 am ashuford.; engineering inspections requests must be made at least 24 hours in advance of inspections. The grading/erosion and stormwater inspector assigned to this project is john fly who can be reached at redacted phone number. The right-of-way for this section of fairview road is 5 feet from the edge of payment. Either place the proposed bus stop outside of this limit or obtain permission from the city of asheville streets division to place the proposed bus stop inside the right-of-way.; fire marshals office plan review comments read attached fire prevention comment sheet the approved plans with Permit type: Com: accessory structure | Permit status: Closed | Permit id: 09-03430 | Parcel: 22089 | |||||
SCORE 100 Com: multi-trade Contractor: Gentry Heating Inc Permit status: Finaled | Permit id: 15-06543 | Parcel: 220891 | |||||
Bus shelter Date: August 4, 2009 Value: $1,110 Client: Wnc Aids Project-Bus Shel | Permit type: Com: accessory structure | Permit status: Closed | Current use: Commercial | Permit id: 09-03430 | Parcel: 22089 | |||||
Tech,hi-touch occupancy permit Date: July 26, 2007 Client: Hi-Tech,Hi-Touch Occup | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 06-05096 | Parcel: 22089 | |||||
Wnc aids project-bus shelter Date: August 4, 2009 Value: $1,110 Permit type: Commercial | Permit status: Closed | Permit id: 09-03430 | |||||
Wnc aids project Date: July 10, 2008 Value: $131,900 Permit type: Historical | Permit status: Closed | Permit id: 08-01689 | |||||
SCORE 100 Com: multi-trade Date: August 14, 2015 Contractor: Gentry Heating Inc Permit status: Finaled | Permit id: 15-10345 | Parcel: 220891 | |||||
October 18, 2006 11:12:33 am pdolen hi-tech, hi-touch occupancy permit; july 26, 2007 2:20:48 pm scarver hi-tech, hi-touch occupancy permit;scc; no change of use.; moving back in to existing building not a change of use fire marshal? S office plan review comments read attached fire prevention comment sheet the approved plans with the attached plan review comments are required to be on the job site at all times. Call for all fire inspections at 828-redacted phone number between the hours of 8: and 9: for a same day inspection. All calls received past 9: am will be scheduled for the next business day. Fire prevention plan review questions may also be directed to this phone number.: the contractor and any affected subcontractor(s) are expected to read and comply with the fire code, all the plan review comments, and are subject to any needed correction orders per ncgs 160a-417 thru 425. Your permit must be posted at the job site at all times or a 100. Stop order fine will be assessed. Ther Date: July 26, 2007 Permit type: Permits - historical | Permit status: Closed | Permit id: 06-05096 | Parcel: 22089 | |||||
March 24, 2008 2:32:01 pm ssalyer commercial interior renovations for wnc aids project;sls; july 10, 2008 7:47:44 pm scarver. Commercial interior renovations for wnc aids project; building inspections contact - gary stamey redacted phone number electrical inspections contact - larry davis redacted phone number plumbing inspections contact - alec arthur redacted phone number mechanical inspections contact - alec arthur redacted phone number all subcontractors need to complete trade application for project. Subcontractors need to either visit the permit office or fax copy of application to (828)redacted phone number for activation of electrical, plumbing & mechancial permits. Building safety review comments the approved plans with the attached review comments are required to be at the job site for use by the field inspector(s) at all times. The building permit is required to be posted at the jobsite at all times. Failure to post approved permits & plans at site is a 75 f Date: July 10, 2008 Permit type: Permits - historical | Permit status: Closed | Permit id: 08-01689 | Parcel: 22089 | |||||
July 9, 2009 1:17:05 pm scarver. Building of a bus shelter through top a stop program;scc; received application and site plans. July 13, 2009 3:05:39 pm soconner.; gave application and site plans to chuck watson for review. July 13, 2009 3:06:04 pm soconner.; zoning approval for the construction of a square foot bus shelter provided by the "top a stop" program. July 16, 2009 9:50:35 am ashuford.; engineering inspections requests must be made at least 24 hours in advance of inspections. The grading erosion and stormwater inspector assigned to this project is john fly who can be reached at redacted phone number. The right-of-way for this section of fairview road is 5 feet from the edge of payment. Either place the proposed bus stop outside of this limit or obtain permission from the city of asheville streets division to place the proposed bus stop inside the right-of-way.; fire marshals office plan review comments read attached fire prevention comment sheet the approved plans with Date: August 4, 2009 Permit type: Com: accessory structure | Permit status: Closed | Permit id: 09-03430 | Parcel: 22089 |