ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
At the cellar >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> make all necessary repairs to the gas hot water heater (ghwh) in order to restore the ghwh to pw Date: September 5, 2013Permit type: Heat | Permit id: Ee05308 | |||||
Apt 2 >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> at the rear room at the # 1 window reglaze the lower window sash. Remove all work related debris. Date: October 17, 2013Permit type: Gc | Permit id: Ee08071 | |||||
Public parts @ public hall, 1st story. Trace and repair the water leak from Date: September 18, 2013Permit type: Gc | Permit id: Ee06128 | |||||
Public parts @ cellar. Pump out sewage accu Date: October 9, 2013Permit type: Stopag | Permit id: Ee07662 | |||||
Full demolition Date: September 17, 2002Permit status: Permit issued | Permit id: 50057408701 | |||||
SCORE 100 Full demolition Date: September 17, 2002 Contractor: N APermit status: Permit issued | Permit id: 50057408701 | |||||
SCORE 64 Date: September 17, 2002 Contractor: Ernest TulierClient: Ernest Tulier | Client Address: Park Hill Lane Si Ny 10308 | Client Phone: (718) 815-5659 | Permit status: Initial | Permit id: 500574087 | |||||
Full demolition Date: September 17, 2002Permit status: Permit issued | Permit id: 50057408701 | |||||
SCORE 64 Date: September 17, 2002 Contractor: Ernest TulierClient: Ernest Tulier | Client Address: Park Hill Lane Si Ny 10308 | Client Phone: (718) 815-5659 | Permit status: Initial | Permit id: 500574087 | |||||
At basement: replace sump pump with all connections to sewer line. Remove all work related debris. Note: contractor must contact h. P. D. @ Date: November 18, 2011Permit type: Plumb | Permit id: Ec13122 | |||||
At basement restore gas fired boiler to p. W. O. Restore heat to entire building. Remove all work related debris. Note: contractor must cont Date: November 17, 2011Permit type: Heat | Permit id: Ec13129 | |||||
At basement supply and install 75 gallon gas fired hot water tank complete w/ all controls and restore to p. W. O. Remove old tank and dispose Date: November 17, 2011Permit type: Heat | Permit id: Ec13126 | |||||
Pump out water thruout entire basement, spread lime, clean and sanitize/broom sweep. Remove all work related debris. Note: contractor must c Date: November 18, 2011Permit type: Stopag | Permit id: Ec13118 | |||||
At basement: repair the broken/ defective water supply pipe located at the front right corner of the basement. Replace parts as needed to stop the wa Date: December 2, 2011Permit type: Plumb | Permit id: Ec13981 | |||||
At basement: repair the broken defective water supply pipe located at the front right corner of the basement. Replace parts as needed to stop the wa Date: December 2, 2011Permit type: Plumb | Permit id: Ec13981 | |||||
Pump out water thruout entire basement, spread lime, clean and sanitize broom sweep. Remove all work related debris. Note: contractor must c Date: November 18, 2011Permit type: Stopag | Permit id: Ec13118 | |||||
At basement supply and install 75 gallon gas fired hot water tank complete w all controls and restore to p. W. O. Remove old tank and dispose Date: November 17, 2011Permit type: Heat | Permit id: Ec13126 |