Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Work includes excavting a 4 ft wide (minimum) and 124 ft long trench (from sta. A195 83 to sta. A196 51 and from sta. B0 39 to sta. B0 95) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108015. Date: April 13, 2015 Client: Potomac Electric Power Company | Permit type: Excavation; electric | Permit id: Pa108714 | |||||
Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0 95 to sta. B3 50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: May 14, 2015 Client: Potomac Electric Power Company | Permit type: Excavation; electric | Permit id: Pa110182 | |||||
Work includes excavting a 4 ft wide (minimum) and 124 ft long trench (from sta. A195 83 to sta. A196 51 and from sta. B0 39 to sta. B0 95) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108015. Date: July 6, 2015 Client: Potomac Electric Power Company | Permit type: Excavation; electric | Permit id: Pa108714-R1 | |||||
Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195 83 to sta. 196 51, and from sta. B0 39 to sta. B0 95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2Æx3Æ handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4Æ wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: November 30, 2015 Client: Potomac Electric Power Company | Permit type: Excavation; electric | Permit id: Pa115723-R1 | |||||
Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0 95 to sta. B3 50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: November 30, 2015 Client: Potomac Electric Power Company | Permit type: Excavation; electric | Permit id: Pa110182-R2 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 124 ft long trench (from sta. A195+83 to sta. A196+51 and from sta. B0+39 to sta. B0+95) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108015. Date: April 13, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: July 11, 2015 | Permit id: Pa108714 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0+95 to sta. B3+50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: May 14, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: October 15, 2015 | Permit id: Pa110182 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 124 ft long trench (from sta. A195+83 to sta. A196+51 and from sta. B0+39 to sta. B0+95) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108015. Date: July 6, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: September 9, 2015 | Permit id: Pa108714-R1 | |||||
SCORE 96 Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195+83 to sta. 196+51, and from sta. B0+39 to sta. B0+95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2x3 handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4 wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: September 9, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: December 29, 2015 | Permit id: Pa115723 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0+95 to sta. B3+50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: September 28, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: December 14, 2015 | Permit id: Pa110182-R1 | |||||
SCORE 96 Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195+83 to sta. 196+51, and from sta. B0+39 to sta. B0+95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2x3 handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4 wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: November 30, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: February 29, 2016 | Permit id: Pa115723-R1 | |||||
SCORE 96 Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195+83 to sta. 196+51, and from sta. B0+39 to sta. B0+95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2x3 handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4 wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: February 1, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: May 1, 2016 | Permit id: Pa115723-R2 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0+95 to sta. B3+50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: January 13, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 12, 2016 | Permit id: Pa110182-R3 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 124 ft long trench (from sta. A195+83 to sta. A196+51 and from sta. B0+39 to sta. B0+95) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108015. Date: July 6, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: September 9, 2015 | Permit id: Pa108714-R1 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0+95 to sta. B3+50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: September 28, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: December 14, 2015 | Permit id: Pa110182-R1 | |||||
SCORE 96 Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195+83 to sta. 196+51, and from sta. B0+39 to sta. B0+95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2x3 handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4 wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: November 30, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: February 29, 2016 | Permit id: Pa115723-R1 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: January 30, 2016 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Date: May 8, 2012 Contractor: Pepco Holdings Inc Permit status: Expired | Expiration date: May 20, 2012 | Permit id: Pa10058143 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Resubmit | Expiration date: May 14, 2012 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 9, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: October 14, 2015 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: November 1, 2015 | Permit id: Pa10210619 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: July 15, 2015 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Date: December 10, 2010 Contractor: Pepco Holdings Inc Permit status: Expired | Expiration date: December 20, 2010 | Permit id: Pa10017960 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: February 15, 2016 | Permit id: 0 | |||||
SCORE 96 Steel plate permit Date: September 24, 2015 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: October 2, 2015 | Permit id: Pa10212527 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: August 13, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: August 14, 2015 | Permit id: 0 | |||||
SCORE 82 Manhole access 11 days Date: November 22, 2010 Contractor: Phi Holdings Inc Permit status: Expired | Expiration date: November 30, 2010 | Permit id: Pa10016894 | |||||
SCORE 96 Excavation; electric ml conduit (trench), excavation; manhole installation Contractor: Potomac Electric Power Company Permit status: 1 | Expiration date: November 2, 2016 | Permit id: 0 | |||||
SCORE 82 Manhole access 11 days Date: November 12, 2010 Contractor: Phi Holdings Inc Permit status: Expired | Expiration date: November 22, 2010 | Permit id: Pa10016430 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: February 12, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 25, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 13, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 22, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 28, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 17, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: July 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: August 5, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: September 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: June 15, 2015 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: July 14, 2015 | Permit id: Pa10192527 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: July 15, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: August 14, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: August 13, 2015 | Permit id: 0 | |||||
SCORE 96 Steel plate- single location Date: September 29, 2015 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: October 9, 2015 | Permit id: Pa10213237 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: February 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 9, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: January 30, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: February 12, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: January 12, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: February 16, 2016 | Permit id: Pa10224652 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 13, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 25, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: September 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: August 5, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 17, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 22, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 28, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: July 10, 2016 | Permit id: 0 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0+95 to sta. B3+50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: January 13, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 12, 2016 | Permit id: Pa110182-R3 | |||||
SCORE 96 Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195+83 to sta. 196+51, and from sta. B0+39 to sta. B0+95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2x3 handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4 wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: February 1, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: May 1, 2016 | Permit id: Pa115723-R2 | |||||
SCORE 96 Excavation; electric ml conduit (trench), excavation; manhole installation Contractor: Potomac Electric Power Company Permit status: 1 | Expiration date: November 2, 2016 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Resubmit | Expiration date: May 14, 2012 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: July 15, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: August 13, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: August 14, 2015 | Permit id: 0 | |||||
SCORE 79 Steel plate- single location Date: August 6, 2015 Contractor: Marc Smyth Permit status: Permit expired | Expiration date: August 14, 2015 | Permit id: Pa10204156-R1 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 9, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: February 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: January 30, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: February 12, 2016 | Permit id: 0 | |||||
SCORE 96 Steel plate- single location Date: January 27, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: February 1, 2016 | Permit id: Pa10228511 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 25, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 13, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 22, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: May 28, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 17, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: July 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: August 5, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: September 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 124 ft long trench (from sta. A195+83 to sta. A196+51 and from sta. B0+39 to sta. B0+95) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108015. Date: April 13, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: July 11, 2015 | Permit id: Pa108714 | |||||
SCORE 96 Work includes excavting a 4 ft wide (minimum) and 255 ft long trench (from sta. Ab0+95 to sta. B3+50) to install 138kv transmission line pipes in wisconsin ave. Nw as shown on the attached drawings. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines between little falls parkway (in maryland) and van ness substation in nw dc. Previous phases traffic control plans have been reviewed by mr. Derrick hardy under tracking #108714. Date: May 14, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: October 15, 2015 | Permit id: Pa110182 | |||||
SCORE 96 Excavation and installation of handholes and pvc conduits in the work area 8a includes excavating a 4-ft wide (minimum) and 124-ft long trench (from sta. 195+83 to sta. 196+51, and from sta. B0+39 to sta. B0+95) to install 138 kv transmission line pipes and manholes along wisconsin ave nw. In addition to the transmission line, two additional 2x3 handholes will be installed in the sidewalk with two (2) 5-inch pvc conduits installed in a 4 wide (trench) which will connect to the manholes located in wisconsin ave as shown on the attached drawings. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: September 9, 2015 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Permit expired | Expiration date: December 29, 2015 | Permit id: Pa115723 | |||||
SCORE 95 Construction staging area Date: December 19, 2013 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: January 17, 2014 | Permit id: Pa10124171 | |||||
SCORE 96 Construction staging area Date: June 3, 2015 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: July 3, 2015 | Permit id: Pa10190672 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: July 15, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: August 13, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: August 14, 2015 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 9, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: February 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: March 25, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: April 12, 2016 | Permit id: Pa10234963 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 13, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 25, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: February 12, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 22, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: July 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 17, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: January 30, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: May 28, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 10, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: September 3, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: August 5, 2016 | Permit id: 0 |