Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Plumbing Date: April 11, 2012 Contractor: Venus Refoua Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 12042-90000-066 | |||||
SCORE 99 Replaster (e) pool, incl. Split main drain. Inspector to verify valu Permit type: Swimming-pool/spa | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 10047-20000-000 | |||||
SCORE 98 Electrical Date: October 29, 2012 Contractor: Doron Cohen Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 12041-90000-258 | |||||
SCORE 100 Plumbing Date: March 24, 2011 Contractor: David Traina Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11042-90000-050 |