ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Replacement hvac (no electrical) Date: March 30, 2016 Contractor: Gabriel Carini Heating And Air Conditioning IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: April 20, 2016 | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 22, 2015Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 20, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Replacement hvac (no electrical) Date: March 30, 2016 Contractor: Gabriel Carini Heating And Air Conditioning IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: April 20, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 22, 2015 Contractor: Semper Solaris Construction IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: November 20, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: April 19, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: November 19, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: September 24, 2007Permit status: Pass | Permit id: Pds2006-1004-20 | |||||
Yard gas 1st Date: November 20, 2006Permit status: Fail | Permit id: Pds2006-1004-20 | |||||
Grading site inspection Date: October 25, 2005Permit status: Done | Permit id: Pds2005-1026-20 |