Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition to dc rec park Date: August 7, 2013 Client: United States Of America | Applicant: Dc Government | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300697 | |||||
Renovation to existing playground and park Date: April 10, 2014 Client: Dc Government | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1307965 | |||||
SCORE 99 Demolition to dc rec park Date: August 7, 2013 Contractor: Dc Government Client: United States Of America | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300697 | |||||
SCORE 100 Renovation to existing playground and park Date: April 10, 2014 Contractor: George Delgado Client: Dc Government | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307965 | |||||
SCORE 56 1 soil boring advanced with an atv drill rig advanced to maximum depths of feet below the ground surface using 3. 25 inch hollow-stem augers which will create a 6-inch annulus. After drilling, borings will be backfilled with bentonite slurry in accordance with doee requirements. Date: October 28, 2016 Client: Samson Kebede Of Moody Nolan For Washington Dc Dpr | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700016 |