Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 Dccr project proposes to drill 1 direct push boring nebbd-70e, located northwest of 501 rhode island ave ne. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. Date: November 12, 2013 Contractor: Sam Connelly Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: March 14, 2014 | |||||
SCORE 85 Construction staging area Date: September 7, 2011 Contractor: Contact Construction Permit status: Rejected | Expiration date: December 7, 2011 | Permit id: 0 | |||||
SCORE 85 Construction staging area Contractor: Contact Construction Permit status: Notpaid | Expiration date: August 1, 2011 | Permit id: 0 | |||||
SCORE 91 Excavation; boring test pit (single) Contractor: Sam Connelly Permit status: 3 | Expiration date: March 14, 2014 | Permit id: 0 | |||||
SCORE 86 Dccr project proposes to drill 1 direct push boring nebbd-70e, located northwest of 501 rhode island ave ne. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. Contractor: Connelly And Associates Inc Permit status: Cancel/withdrawn | Expiration date: March 14, 2014 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: August 22, 2013 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: September 18, 2013 | Permit id: Pa10108937 | |||||
SCORE 91 Excavation; boring test pit (single) Contractor: Sam Connelly Permit status: 3 | Expiration date: March 14, 2014 | Permit id: 0 | |||||
SCORE 85 Construction staging area Contractor: Contact Construction Permit status: Notpaid | Expiration date: August 1, 2011 | Permit id: 0 | |||||
SCORE 79 Dccr project proposes to excavate 3 shallow pits (nebbv-27, nebbv-28, nebbv-29) for the purpose of utility location along 5th st. Ne, between w st ne and rhode island ave ne. The pit will be approximately 1 foot in diameter and less than feet deep. The pit will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. The work zone will not impact sidewalks, parking meters and trees, however nebbv-28 will require the use of flagmen. Date: July 2, 2013 Contractor: Insight Llc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 15, 2014 | Permit id: Pa84366 | |||||
SCORE 86 Dccr project proposes to drill 1 direct push boring nebbd-70e, located northwest of 501 rhode island ave ne. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. Contractor: Connelly And Associates Inc Permit status: Cancel/withdrawn | Expiration date: March 14, 2014 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: September 10, 2013 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: October 16, 2013 | Permit id: Pa10108937-R1 |