Building Permits at 5005 Sherier Place Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 5005 Sherier Place Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Work includes 10-inch to 108-inch pipe, totaling approximately 9,0 linear feet. 36 pipes at 23 locations were identified for some type of rehabilitation under sewer under buildings (sub) phase 2, including manhole installation, chemical grouting, cured-in-place pipe lining (cipp) and shotcrete lining. This project will take place at locations throughout dc. Of the loctaions only 2 locations (96 42nd street ne & 9 blue plains drive sw) require excavation. The other 18 locations will be lined with no excavation. The site locations are: site 1 chain bridge road nw & sherier place nw site 2 kanawha street nw & jocelyn street nw site 3 p street nw & 17th street nw site 4/5 upshur street nw & 13th street nw site 6 florida ave nw & w street nw site 7 8th street nw & d street nw site 8 5th street nw & g street nw site 10 2nd street nw & f street nw site 11 randolph place ne & s street ne site 12 c street se & 7th street se site 13 perry street ne and 10th street ne site 14 south dakota avenue
Date:  December 29, 2014
Value:   $320

Client: Dcwatercip | Permit type: Excavation; repair s | Permit id: Pa104353
2014/12/29320955005 Sherier Place Nw Washington Dc
SCORE
100
Excavation; repair sewer main line, excavation; manhole installation
Contractor: Dcwater Cip

Permit status: 1 | Expiration date: February 24, 2017 | Permit id: 0
01005005 Sherier Place Nw Washington DcDcwater Cip
SCORE
100
Steel plate- single location
Date:  October 24, 2016
Contractor: Dcwater Cip

Permit status: Expired | Expiration date: October 27, 2016 | Permit id: Pa10352262
2016/10/2401005005 Sherier Place Nw Washington DcDcwater Cip
SCORE
100
Work includes 10-inch to 108-inch pipe, totaling approximately 9,0 linear feet. 36 pipes at 23 locations were identified for some type of rehabilitation under sewer under buildings (sub) phase 2, including manhole installation, chemical grouting, cured-in-place pipe lining (cipp) and shotcrete lining. This project will take place at locations throughout dc. Of the loctaions only 2 locations (96 42nd street ne & 9 blue plains drive sw) require excavation. The other 18 locations will be lined with no excavation. The site locations are: site 1 chain bridge road nw & sherier place nw site 2 kanawha street nw & jocelyn street nw site 3 p street nw & 17th street nw site 4/5 upshur street nw & 13th street nw site 6 florida ave nw & w street nw site 7 8th street nw & d street nw site 8 5th street nw & g street nw site 10 2nd street nw & f street nw site 11 randolph place ne & s street ne site 12 c street se & 7th street se site 13 perry street ne and 10th street ne site 14 south dakota avenue
Date:  May 31, 2016
Contractor: Dcwater Cip

Permit type: Excavation; repair sewer main line, excavation; manhole installation | Permit status: Permit expired | Expiration date: August 28, 2016 | Permit id: Pa104353-R1
2016/05/3101005005 Sherier Place Nw Washington DcDcwater Cip
SCORE
100
Excavation; repair sewer main line, excavation; manhole installation
Contractor: Dcwater Cip

Permit status: 1 | Expiration date: February 24, 2017 | Permit id: 0
01005005 Sherier Place Nw Washington DcDcwater Cip
SCORE
100
Work includes 10-inch to 108-inch pipe, totaling approximately 9,0 linear feet. 36 pipes at 23 locations were identified for some type of rehabilitation under sewer under buildings (sub) phase 2, including manhole installation, chemical grouting, cured-in-place pipe lining (cipp) and shotcrete lining. This project will take place at locations throughout dc. Of the loctaions only 2 locations (96 42nd street ne & 9 blue plains drive sw) require excavation. The other 18 locations will be lined with no excavation. The site locations are: site 1 chain bridge road nw & sherier place nw site 2 kanawha street nw & jocelyn street nw site 3 p street nw & 17th street nw site 4/5 upshur street nw & 13th street nw site 6 florida ave nw & w street nw site 7 8th street nw & d street nw site 8 5th street nw & g street nw site 10 2nd street nw & f street nw site 11 randolph place ne & s street ne site 12 c street se & 7th street se site 13 perry street ne and 10th street ne site 14 south dakota avenue
Date:  December 29, 2014
Contractor: Dcwater Cip

Permit type: Excavation; repair sewer main line, excavation; manhole installation | Permit status: Permit expired | Expiration date: June 29, 2016 | Permit id: Pa104353
2014/12/2901005005 Sherier Place Nw Washington DcDcwater Cip
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.