Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: November 17, 2014 Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit status: Completed | Permit id: 568382 | |||||
Alteration permit Date: November 17, 2014 Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit status: Completed | Permit id: 568382 | |||||
SCORE 100 Conduits,grounding,branch circuits,safety switches,fuses,manual motor starters,combination starter safety sws,circuit breaker,power,lighting,tel phone cabling and jacks,lighting protection,mech and plumbing equipment power connections and control wiring per 2008 nec (school) Date: November 28, 2017 Contractor: Mulhern Electric Co Inc Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Electrical permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 818465 | |||||
SCORE 100 Exterior alterations, remove existing roofing material down to concrete roof deck. Roof deck will remain. Install new roofing membrane per plans and specs. Masonry work per plans and specs. Date: November 17, 2014 Contractor: Robert Ganter Contractors Inc Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Alteration permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 568382 | |||||
SCORE 100 Alteration: interior plumbing; school basement - the installation will compy with the philadephia plubming code 2004 Date: July 26, 2017 Contractor: Herman Goldner Co Inc Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Plumbing permit | Permit status: Active | Completion date: August 2, 2017 | Permit id: 800610 | |||||
Limited site excavation subgrade prep and installation of one (1), 5,0 gallon double-wall steel underground fuel oil storage tank with associated piping and monitoring system per plans. All work shall be in accordance with padep regulations and nfpa and 31. Fuel separate permits required for any electrical or plumbing work. Date: August 1, 2017 Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: New construction permit | Permit status: Active | Completion date: August 8, 2017 | Permit id: 796759 | |||||
SCORE 100 Mechanical improvements to an existing school to include remove exisitng and install two new boilers, piping, expansion tanks, air separator, and piping, five new heating and ventilating units new unit ventilators, new fuel oil pumps, controls, and accessories, provide new natural gas service to building with two new natural gas boosters and remove and provide new boiler room floor slab, new floor drains, service sink, piping, and accessories as per approved plans. Date: July 19, 2017 Contractor: Herman Goldner Co Inc Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Mechanical permit | Permit status: Active | Completion date: July 19, 2017 | Permit id: 795650 | |||||
For exterior alterations to roof assembly to include the complete replacement of existing low slope roofing, insulation, flashings, roof drains, metal copings, cleaning and repointing of limestone trim on north and south facades of the existing building. All work to be done per approved plans. Separate permits required or all other work. Date: November 6, 2014 Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Alteration permit | Permit status: Completed | Completion date: January 4, 2016 | Permit id: 558360 |