ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Plumbing permit Date: October 3, 2014Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 566029 | |||||
Electrical permit Date: September 30, 2014Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 565075 | |||||
Alteration permit Date: September 26, 2014Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 564079 | |||||
Alteration permit Date: July 9, 2012Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 415263 | |||||
Alteration permit Date: July 9, 2013Client: Rodriguez Ubaldo | Permit status: Expired | Permit id: 465376 | |||||
Permit for the erection of a rear addition (height n. T. E. 38-0", staircase to grade) to an existing semi-detached structure with accessory awning sign for a food, beverages and groceries use on the first floor and one (1) apartment on the second floor. Size and location as shown in plans. Date: January 22, 2013Client: Rodriguez Ubaldo | Applicant: Beditza Cadillo | Permit type: Appeal | Permit status: Denied | Permit id: 19691 | |||||
Alteration permit Date: July 9, 2013Client: Rodriguez Ubaldo | Permit status: Expired | Permit id: 465376 | |||||
Alteration permit Date: September 26, 2014Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 564079 | |||||
Plumbing permit Date: October 3, 2014Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 566029 | |||||
Electrical permit Date: September 30, 2014Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 565075 | |||||
Alteration permit Date: July 9, 2012Client: Rodriguez Ubaldo | Permit status: Completed | Permit id: 415263 | |||||
Permit for the erection of a rear addition (height n. T. E. 38-0", staircase to grade) to an existing semi-detached structure with accessory awning sign for a food, beverages and groceries use on the first floor and one (1) apartment on the second floor. Size and location as shown in plans. Date: January 22, 2013Client: Rodriguez Ubaldo | Applicant: Beditza Cadillo | Permit type: Appeal | Permit status: Denied | Permit id: 19691 | |||||
SCORE 100 Building repairs to comply case: repair the existing wood frame bay. All repairs to match original in size and location. Date: July 9, 2012 Contractor: Frankford Business Ctr ContClient: Rodriguez Ubaldo | Permit type: Alteration permit | Permit status: Completed | Completion date: September 11, 2012 | Permit id: 415263 | |||||
SCORE 100 For the construction of accessible ramp and exterior stairs only. Separate permits required for interior alterations and certificate of occupancy. Date: July 9, 2013 Contractor: Frankford Business Ctr ContClient: Rodriguez Ubaldo | Permit type: Alteration permit | Permit status: Expired | Completion date: September 18, 2014 | Permit id: 465376 | |||||
SCORE 86 Interior renovations to sfd interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations. Separate permits required for plumbing, electric and hvac. Date: September 26, 2014 Contractor: Eladios Construction CorpClient: Rodriguez Ubaldo | Permit type: Alteration permit | Permit status: Completed | Completion date: May 27, 2015 | Permit id: 564079 | |||||
SCORE 89 Partial rewire, outlets, lights, switches, gfcis smoke detectors and 200amp service as per 2008 nec (east district) Date: September 30, 2014 Contractor: Digno DislaClient: Rodriguez Ubaldo | Permit type: Electrical permit | Permit status: Completed | Completion date: October 30, 2015 | Permit id: 565075 | |||||
SCORE 93 Install drain and water to supply 2 wc,2 lav,2 bath tubs,1 kitchen sink (sfd) Date: October 3, 2014 Contractor: Wise Guys Construction LlcClient: Rodriguez Ubaldo | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 27, 2015 | Permit id: 566029 |