Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Reroof with 65 sqrs built up roofing. Existing solid sheathing. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Apartment | Permit id: 12016-90000-003 | |||||
SCORE 96 Supplemental to 11016-10000-06271 for foundation replacement as per en Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Apartment | Permit id: 11016-10001-062 | |||||
SCORE 99 Installation of waste, water, solar water heating and sump pump system Date: June 10, 2011 Contractor: Sang Lee Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-10000-219 | |||||
SCORE 98 Fire sprinkler Date: September 28, 2011 Contractor: Michael Flynn Permit status: Permit finaled | Current use: Commercial | Permit id: 11043-90000-024 | |||||
SCORE 89 New methane gas control system. Electrical plan check for power. Date: October 11, 2011 Contractor: Chris Tekaat Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-004 | |||||
SCORE 99 Hvac Date: October 5, 2012 Contractor: Sang Lee Permit status: Permit finaled | Current use: Commercial | Permit id: 10044-10001-127 | |||||
SCORE 99 Installation of split systems for a 6 story, 66unit residential buildi Date: October 20, 2011 Contractor: Sang Lee Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 10044-10000-127 | |||||
SCORE 97 Permanent/temporary shoring for 5 story 66 affordable housing units Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Apartment | Permit id: 11020-20000-003 | |||||
Plumbing Date: May 18, 2011 Permit status: Permit finaled | Current use: Apartment | Permit id: 11042-10001-063 | |||||
SCORE 68 Fire alarm for a new building with over 2 devices. Date: January 27, 2012 Contractor: Oshin Thomassian Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-223 | |||||
SCORE 89 Install level 5 buffer zone methane mitigation system. Date: August 26, 2011 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-004 | |||||
Install one elevator 6 stops. Date: July 24, 2012 Permit type: Elevator | Permit status: Permit finaled | Current use: Apartment | Permit id: 12046-10000-007 | |||||
SCORE 96 Voluntary foundation retrofit and epoxy stemwall cracks. No visible e Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 11016-10000-062 | |||||
SCORE 91 Supplemental to pcis# 10010-10000-02604 to revise the height of the bu Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Apartment | Permit id: 10010-20001-026 | |||||
SCORE 99 Electrical Date: May 18, 2011 Contractor: Fabian Permit status: Permit closed | Current use: Apartment | Permit id: 11041-10000-101 | |||||
SCORE 91 New 5 story 66 unit consists of 14 low income household (hcd) & 51 low Permit type: Bldg-new | Permit status: Cofo issued | Current use: Apartment | Permit id: 10010-10000-026 | |||||
SCORE 56 Grading site prep., excavation for sub-terranien garage for 66 unit ap Permit type: Grading | Permit status: Permit finaled | Current use: Apartment | Permit id: 11030-20000-010 | |||||
SCORE 97 Supplement to 11020-20000-003 for plan revision of teporary shoring Permit type: Nonbldg-alter/repair | Permit status: Permit finaled | Current use: Apartment | Permit id: 11020-20001-003 | |||||
SCORE 76 Plumbing Date: June 11, 2012 Contractor: Paul Maylone Permit status: Permit finaled | Current use: Apartment | Permit id: 12042-10000-105 | |||||
Electrical Date: May 23, 2012 Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-10000-118 | |||||
Install new fire sprinkler system for 5 story + basement, 66 units apa Date: November 4, 2011 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Apartment | Permit id: 11043-10000-024 | |||||
Install two led illuminated channel letter wall sign. The sign reads " Date: August 30, 2012 Value: $3,200 Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 12048-20000-019 | |||||
SCORE 99 Plumbing Date: August 29, 2011 Contractor: Sang Lee Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-10002-219 | |||||
SCORE 56 New 66 units affordable family housing. Date: July 20, 2011 Contractor: Sipan Arezoomaian Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-254 | |||||
SCORE 89 Pv2 install roof-mounted solar array on apartment building. Interconne Date: December 4, 2014 Contractor: Lital Cohen Permit type: Electrical | Permit status: Permit finaled | Current use: Apartment | Permit id: 14041-20000-307 | |||||
SCORE 88 Electrical Date: June 24, 2015 Contractor: Milos Permit status: Permit finaled | Current use: Apartment | Permit id: 15041-20000-199 | |||||
SCORE 97 Tear off existing roofing. Re-roof 1 squares w/class a or b mate Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Apartment | Permit id: 14016-40000-192 |