ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 75 No excavation. Monitoring well exists. The final stage of installation for the flute multiport well, mp-5, involves the installation of the multiport liner in accordance with the ddoe approved work plan, previous ddot construction permit 95726, and occupancy permit 10149655. Currently, an existing bedrock borehole (mp-5) with a temporary blank liner is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. Following the profiling, borehole geophysical testing, and final liner design; the final stage of installation involves replacing the temporary blank liner with the permanent a water flute liner. The liner will facilitate collecting water samples from the following discrete sampling intervals in feet below ground surface: 37. 5 to 45, 55 to 67. 5, to 107. 5, 122. 5 to 132. 5, and 177. 5 to 182. 5. This activity will require 24/7 closure of approximately 5 lf of rockwood pwky at the intersection of glenbrook road nw washington dc for Date: September 16, 2014Client: Us Army Corps Of Engineers Co Todd Beckwith | Permit type: Excavation; monitori | Permit id: Pa100280 | |||||
SCORE 75 No well is being constructed; urs is seeking a lane closure permit on behalf of us army corp of engineers to collect groundwater samples from the flute multiport well, mp-5, at discrete sampling intervals in accordance with the ddoe approved work plan. Mp-5 is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. In order to best perform this sampling with limited traffic interference, traffic attempting to access rockwood pwky nw from glenbrook road nw (using overlook road nw) shall be detoured using indian lane nw. This activity will require the closure of approximately 4 lf of southbound rockwood pwky at the intersection of glenbrook road nw washington dc. Sampling is expected to be completed in one (1) day. Date: November 21, 2014Client: Us Army Corps Of Engineers Co Todd Beckwith | Permit type: Excavation; monitori | Permit id: Pa102996 | |||||
No excavation. Monitoring well exists. The final stage of installation for the flute multiport well, mp-5, involves the installation of the multiport liner in accordance with the ddoe approved work plan, previous ddot construction permit 95726, and occupancy permit 10149655. Currently, an existing bedrock borehole (mp-5) with a temporary blank liner is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. Following the profiling, borehole geophysical testing, and final liner design; the final stage of installation involves replacing the temporary blank liner with the permanent a water flute liner. The liner will facilitate collecting water samples from the following discrete sampling intervals in feet below ground surface: 37. 5 to 45, 55 to 67. 5, to 107. 5, 122. 5 to 132. 5, and 177. 5 to 182. 5. This activity will require 24/7 closure of approximately 5 lf of rockwood pwky at the intersection of glenbrook road nw washington dc for Date: September 16, 2014Client: Us Army Corps Of Engineers Co Todd Beckwith | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: December 4, 2014 | Permit id: Pa100280 | |||||
No well is being constructed; urs is seeking a lane closure permit on behalf of us army corp of engineers to collect groundwater samples from the flute multiport well, mp-5, at discrete sampling intervals in accordance with the ddoe approved work plan. Mp-5 is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. In order to best perform this sampling with limited traffic interference, traffic attempting to access rockwood pwky nw from glenbrook road nw (using overlook road nw) shall be detoured using indian lane nw. This activity will require the closure of approximately 4 lf of southbound rockwood pwky at the intersection of glenbrook road nw washington dc. Sampling is expected to be completed in one (1) day. Date: November 21, 2014Client: Us Army Corps Of Engineers Co Todd Beckwith | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: February 26, 2015 | Permit id: Pa102996 | |||||
No excavation. Monitoring well exists. The final stage of installation for the flute multiport well, mp-5, involves the installation of the multiport liner in accordance with the ddoe approved work plan, previous ddot construction permit 95726, and occupancy permit 10149655. Currently, an existing bedrock borehole (mp-5) with a temporary blank liner is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. Following the profiling, borehole geophysical testing, and final liner design; the final stage of installation involves replacing the temporary blank liner with the permanent a water flute liner. The liner will facilitate collecting water samples from the following discrete sampling intervals in feet below ground surface: 37. 5 to 45, 55 to 67. 5, to 107. 5, 122. 5 to 132. 5, and 177. 5 to 182. 5. This activity will require 24/7 closure of approximately 5 lf of rockwood pwky at the intersection of glenbrook road nw washington dc for Date: September 16, 2014Client: Us Army Corps Of Engineers Co Todd Beckwith | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: December 4, 2014 | Permit id: Pa100280 | |||||
No well is being constructed; urs is seeking a lane closure permit on behalf of us army corp of engineers to collect groundwater samples from the flute multiport well, mp-5, at discrete sampling intervals in accordance with the ddoe approved work plan. Mp-5 is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. In order to best perform this sampling with limited traffic interference, traffic attempting to access rockwood pwky nw from glenbrook road nw (using overlook road nw) shall be detoured using indian lane nw. This activity will require the closure of approximately 4 lf of southbound rockwood pwky at the intersection of glenbrook road nw washington dc. Sampling is expected to be completed in one (1) day. Date: November 21, 2014Client: Us Army Corps Of Engineers Co Todd Beckwith | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: February 26, 2015 | Permit id: Pa102996 | |||||
SCORE 75 No well is being constructed; urs is seeking a lane closure permit on behalf of us army corp of engineers to collect groundwater samples from the flute multiport well, mp-5, at discrete sampling intervals in accordance with the ddoe approved work plan. Mp-5 is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. In order to best perform this sampling with limited traffic interference, traffic attempting to access rockwood pwky nw from glenbrook road nw (using overlook road nw) shall be detoured using indian lane nw. This activity will require the closure of approximately 4 lf of southbound rockwood pwky at the intersection of glenbrook road nw washington dc. Sampling is expected to be completed in one (1) day. Date: November 21, 2014Client: Us Army Corps Of Engineers C O Todd Beckwith | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: February 26, 2015 | Permit id: Pa102996 | |||||
SCORE 89 Enp for ddot contractors Date: May 13, 2016 Contractor: Delante ToyerPermit status: Expired | Expiration date: June 3, 2016 | Permit id: Pa10274307 | |||||
SCORE 100 Enp for ddot contractors Date: June 2, 2016 Contractor: Fort Myer Construction CorpPermit status: Expired | Expiration date: June 27, 2016 | Permit id: Pa10287621 | |||||
SCORE 67 No excavation. Monitoring well exists. The final stage of installation for the flute multiport well, mp-5, involves the installation of the multiport liner in accordance with the ddoe approved work plan, previous ddot construction permit 95726, and occupancy permit 10149655. Currently, an existing bedrock borehole (mp-5) with a temporary blank liner is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. Following the profiling, borehole geophysical testing, and final liner design; the final stage of installation involves replacing the temporary blank liner with the permanent a water flute liner. The liner will facilitate collecting water samples from the following discrete sampling intervals in feet below ground surface: 37. 5 to 45, 55 to 67. 5, to 107. 5, 122. 5 to 132. 5, and 177. 5 to 182. 5. This activity will require 24 7 closure of approximately 5 lf of rockwood pwky at the intersection of glenbrook road nw washington dc for Date: September 25, 2014 Contractor: Urs Corporation On Behalf Of UsacePermit status: Permit expired | Expiration date: December 4, 2014 | Permit id: Pa100280 | |||||
SCORE 67 No well is being constructed; urs is seeking a lane closure permit on behalf of us army corp of engineers to collect groundwater samples from the flute multiport well, mp-5, at discrete sampling intervals in accordance with the ddoe approved work plan. Mp-5 is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. In order to best perform this sampling with limited traffic interference, traffic attempting to access rockwood pwky nw from glenbrook road nw (using overlook road nw) shall be detoured using indian lane nw. This activity will require the closure of approximately 4 lf of southbound rockwood pwky at the intersection of glenbrook road nw washington dc. Sampling is expected to be completed in one (1) day. Date: December 15, 2014 Contractor: Urs Corporation On Behalf Of UsacePermit status: Permit expired | Expiration date: February 26, 2015 | Permit id: Pa102996 | |||||
SCORE 75 No excavation. Monitoring well exists. The final stage of installation for the flute multiport well, mp-5, involves the installation of the multiport liner in accordance with the ddoe approved work plan, previous ddot construction permit 95726, and occupancy permit 10149655. Currently, an existing bedrock borehole (mp-5) with a temporary blank liner is located 5 feet se from lot 0901, square 1513, at the intersection of overlook road, nw and rockwood parkway, nw. Following the profiling, borehole geophysical testing, and final liner design; the final stage of installation involves replacing the temporary blank liner with the permanent a water flute liner. The liner will facilitate collecting water samples from the following discrete sampling intervals in feet below ground surface: 37. 5 to 45, 55 to 67. 5, to 107. 5, 122. 5 to 132. 5, and 177. 5 to 182. 5. This activity will require 24 7 closure of approximately 5 lf of rockwood pwky at the intersection of glenbrook road nw washington dc for Date: September 16, 2014Client: Us Army Corps Of Engineers C O Todd Beckwith | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: December 4, 2014 | Permit id: Pa100280 | |||||
SCORE 67 Construction staging area Date: October 27, 2014Permit status: Permit expired | Expiration date: November 24, 2014 | Permit id: Pa10162029 |