ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Plumbing permit Date: September 28, 2012Client: Li Guorong Zhu David | Permit status: Completed | Permit id: 429985 | |||||
Electrical permit Date: September 24, 2012Client: Li Guorong Zhu David | Permit status: Completed | Permit id: 428828 | |||||
Alteration permit Date: September 20, 2012Client: Li Guorong Zhu David | Permit status: Completed | Permit id: 428447 | |||||
Plumbing permit Date: September 28, 2012Client: Li Guorong Zhu David | Permit status: Completed | Permit id: 429985 | |||||
Electrical permit Date: September 24, 2012Client: Li Guorong Zhu David | Permit status: Completed | Permit id: 428828 | |||||
Alteration permit Date: September 20, 2012Client: Li Guorong Zhu David | Permit status: Completed | Permit id: 428447 | |||||
SCORE 100 Change soil pipe in basement & reset toilet, sink,reconnect tub & vanity (4fd) Date: September 28, 2012 Contractor: Thomas QuagliarelloClient: Li Guorong Zhu David | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 24, 2012 | Permit id: 429985 | |||||
SCORE 100 Replace 4-switches, 3-gfci, 6-light fixture, 1-refrig outlet & 1-240v outlet. Correct or reinstall 2-120v outdoor conduit acoording to nec requirement. Connect two existing wiring to new range hood as per nec 2008 (multi family) Date: September 24, 2012 Contractor: Comfort Solutions Heat And A C IClient: Li Guorong Zhu David | Permit type: Electrical permit | Permit status: Completed | Completion date: December 10, 2012 | Permit id: 428828 | |||||
First floor , kitchen, bathroom upgrades to include new floors wall covering and cabinets Date: September 20, 2012Client: Li Guorong Zhu David | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2012 | Permit id: 428447 |