Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install evap cooler, heater, ducts 1- openings Date: September 20, 2006 Contractor: Garick Electric Permit type: Mechanical | Permit status: Inspection | Permit id: Mec06-05153 | |||||
SCORE 93 Elec for (1) 5-ton split using existing ducane furnace Date: October 5, 2010 Contractor: Kings Aire Elec Permit type: Electrical | Permit status: Inspection | Permit id: Ele10-05240 | |||||
(1) 5-ton split using existing ducane furnace Date: October 5, 2010 Permit type: Mechanical | Permit status: Inspection | Permit id: Mec10-05199 | |||||
SCORE 100 2-w c, 2-tubs, 1-washer, 1-dryer, service Date: September 20, 2006 Contractor: Garick Electric Permit type: Plumbing | Permit status: Inspection | Permit id: Plm06-05886 | |||||
Elec for (1) 5-ton split using existing ducane furnace Date: October 5, 2010 Permit type: Electrical | Permit status: Inspection | Permit id: Ele10-05240 |