ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Roof mount residential solar pv for existing sfd with new advanced energy storage battery backup system-misc. Elec. Fee (no meter upgrade) this permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 9 29 17 plan change - see c of a -rm 07 28 17 scope change to match plans with battery backup unit mwp Date: July 28, 2017 Contractor: Solare Energy IncPermit type: Addn | Permit status: Completed | Completion date: October 4, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd with new advanced energy storage battery backup system-misc. Elec. Fee (no meter upgrade) this permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 07 28 17 scope change to match plans with battery backup unit mwp Date: July 28, 2017 Contractor: Solare Energy IncPermit type: Online | Permit status: Issued | Permit id: Pds2017-Resalt- |