Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replace sewer line from property line to main Date: September 15, 2003 Contractor: Pipeline Industries Inc Client: Teresia Cheng | Applicant: Pipeline Industries, Inc. | Permit type: Right-of-way | Permit status: Cmp | |||||
SCORE 93 Installation of two compliant egress windows in the baement (to utilize the width of two existing windows) and installation of three replacement windows. Client: Paula Greene | Applicant: Egress, Inc-Dischner Const. Ser. | Permit type: Building | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family d | |||||
SCORE 68 Addition of 788 sf on a 2nd level (to create a master suite) and through conversion of a portion of an existing garage -- remodel of 1,356 sf to an existing sfd. Attached garage addition of 377 sf, and 72 sf balcony off the master suite. Client: Paula Greene | Applicant: Fuller House Construction Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 5, 2013 | Current use: Single family d | |||||
SCORE 95 Installation of replacement a c system for single family residence (17 seer, 2 ton). Date: August 17, 2015 Contractor: Cooper Heating And Cooling Client: Paula Greene,John Kilraia | Applicant: Cooper Heating & Cooling | Permit type: Electrical, mechanic | Permit status: Iss | Current use: Single family d | |||||
SCORE 93 Installation of two compliant egress windows in the baement (to utilize the width of two existing windows) and installation of three replacement windows. Client: Paula Greene | Permit type: Building | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family detached dwelling, alterat | Permit id: Pmt2009-02391 | |||||
SCORE 68 Addition of 788 sf on a 2nd level (to create a master suite) and through conversion of a portion of an existing garage -- remodel of 1,356 sf to an existing sfd. Attached garage addition of 377 sf, and 72 sf balcony off the master suite. Client: Paula Greene | Permit type: Building, electrical, mechanical, plumbing, siding, roofing | Permit status: Cmp | Completion date: April 5, 2013 | Current use: Single family detached dwelling, additio | Permit id: Pmt2012-02830 | |||||
SCORE 95 Replace sewer line from property line to main Date: September 15, 2003 Contractor: Pipeline Industries, Inc Client: Teresia Cheng | Permit type: Right-of-way | Permit status: Cmp | Permit id: Pmt2003-03911 | |||||
SCORE 95 Installation of replacement a c system for single family residence (17 seer, 2 ton). Client: Paula Greene | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: September 3, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-03479 |