Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 4. 95kwdc rooftop pv system Date: October 14, 2014 Contractor: Sme Inc Of Seattle Permit type: Electrical | Permit status: Permit closed | Completion date: November 5, 2014 | Expiration date: October 14, 2015 | Current use: Single family / duplex | Permit id: 6441397 | |||||
SCORE 95 Sewer repair Date: March 25, 2014 Contractor: Loyal Mechanical Inc Applicant: Loyal Mechanical Inc | Permit type: Side sewer | Permit status: Permit closed | Completion date: May 23, 2014 | Expiration date: September 25, 2015 | Current use: Single family / duplex | Permit id: 6410163 |