ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Replace six existing antennas with six new antennas. Add one new site support cabinet to existing steel equipment platform. Date: September 7, 2012Client: Pacin Healthcare Hadley | Applicant: Pacin Healthcare Hadley; Brad Fleegle | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200326 | |||||
Replacement of hydraulic power unit on elevator #4 (four) Date: July 31, 2012Client: Specialty Hospital Of Washington-Hadley Llc | Applicant: Advanced Elevator | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1202315 | |||||
Plumbing and gas Date: March 2, 2012Client: Specialty Hospital Of Washington-Hadley Llc | Applicant: John Mcdonald | Permit status: Permit issued | Permit id: P1203563 | |||||
Replace hydraulic pump unit and starter panel on elevator #5 est. Cost of work : 11,320. 00 Date: April 22, 2014Client: Specialty Hospital Of Washington-Hadley Llc | Applicant: Advanced Elevator Corp | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1401619 | |||||
SCORE 100 Plumbing and gas Date: March 2, 2012 Contractor: John McdonaldClient: Specialty Hospital Of Washington-Hadley Llc | Permit status: Permit issued | Permit id: P1203563 | |||||
Plumbing and gas Date: March 28, 2016Client: Dca Acquisitions Llc | Permit status: Permit issued | Permit id: P1604932 | |||||
SCORE 56 Replace six existing antennas with six new antennas. Add one new site support cabinet to existing steel equipment platform. Date: September 7, 2012 Contractor: Pacin Healthcare Hadley Brad FleegleClient: Pacin Healthcare Hadley | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200326 | |||||
SCORE 100 Plumbing and gas Date: March 2, 2012 Contractor: John McdonaldClient: Specialty Hospital Of Washington-Hadley Llc | Permit status: Permit issued | Permit id: P1203563 | |||||
Plumbing and gas Date: March 28, 2016Client: Dca Acquisitions Llc | Permit status: Permit issued | Permit id: P1604932 | |||||
SCORE 100 Plumbing and gas Date: March 28, 2016 Contractor: Jerone ScottClient: Dca Acquisitions Llc | Permit status: Permit issued | Permit id: P1604932 | |||||
SCORE 93 Replace hydraulic pump unit and starter panel on elevator #5 est. Cost of work : 11,320. 00 Date: April 22, 2014 Contractor: Advanced Elevator CorpClient: Specialty Hospital Of Washington-Hadley Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1401619 | |||||
SCORE 56 Replace six existing antennas with six new antennas. Add one new site support cabinet to existing steel equipment platform. Date: September 7, 2012 Contractor: Pacin Healthcare Hadley; Brad FleegleClient: Pacin Healthcare Hadley | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200326 | |||||
SCORE 66 Replacement of hydraulic power unit on elevator #4 (four) Date: July 31, 2012 Contractor: Advanced ElevatorClient: Specialty Hospital Of Washington-Hadley Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1202315 | |||||
SCORE 100 Plumbing and gas Date: March 2, 2012 Contractor: John McdonaldClient: Specialty Hospital Of Washington-Hadley Llc | Permit status: Permit issued | Permit id: P1203563 | |||||
SCORE 56 Install 2 building signs and 1 sign on monument Date: September 4, 2015 Contractor: Steven Sterico Signs; James ChappelleClient: Tony Garcia Dca Capitol Hill Ltac, Llc | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1500415 | |||||
SCORE 89 Repairing existing epdm with new epdm membrane, no changes will be made to the structure or penetrations. Date: May 13, 2015 Contractor: Virginia Roofing CorporationClient: Dca Aquisitions, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1507651 | |||||
SCORE 84 T-mobile will replace three existing antennas with three new antennas and install three new rrus as support equipment. Date: May 19, 2016 Contractor: Phil StetlerClient: Pacin Healthcare Hadley Memorial Capital Pacin Healthcare Hadley | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600058 | |||||
SCORE 56 Install a 3 foot tall iron fence along front of hospital property, from exit drive to loading dock driveway. Date: June 29, 2016Client: Na Bridge Point Hospital Hadley | Permit type: Fence | Permit status: Permit issued | Permit id: F1600429 | |||||
SCORE 100 Plumbing and gas Date: March 28, 2016 Contractor: Jerone ScottClient: Dca Acquisitions Llc | Permit status: Permit issued | Permit id: P1604932 | |||||
SCORE 56 1. Interior demolition will include gypsum wall board partitions, doors and frames, mill-work cabinets, ceiling finishes, carpet flooring, restrooms, duct work. 2. Exterior demolition will include railing by stairs, sheet metal roof and walls. All load bearing walls and steel structure will remain. Date: March 6, 2017 Contractor: Bridgepoint Healthcare; Gustavo RodriguezClient: N A Bridgepoint Healthcare | Permit type: Demolition | Permit status: Permit issued | Permit id: D1700317 | |||||
SCORE 56 Removing 6 existing antennas, 3 existing tmas, 1 coax cable per sector, and installing 6 proposed antennas, 3 proposed rrus and 3 proposed hybrid cables to an existing telecommunications facility Date: February 16, 2017 Contractor: Dca Aquisitions Llc David Ishii; Jim CalabreseClient: Dca Acquisitions Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1700072 |